Nationwide Building Society data center in Swindon
Nationwide Building Society data center in Swindon is an operational data center operated by Nationwide Building Society in Swindon, United Kingdom. Our footprint estimate of its power is about 4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Nationwide Building Society |
| Facility power | 4 MW (range 1.6 MW to 10 MW) Estimate from building footprint, low confidence. Footprint estimate: about 33,328 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 1,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Nationwide Swindon Technology Centre |
| Coordinates | 51.57225, -1.83623 |
Power and grid
| Nearest high-voltage substation | Swindon BSP, 132 kV, 1.5 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Minety Substation, 400 kV, 12.1 km away |
| HV substations within 10 km | 3 |
| Power plants within 50 km | 3.8 GW in 111 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.7 °C (2001 to 2025) |
| Cooling degree days | 33 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.94 kWh per m² per day |
| Wind at 50 m | 7.2 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Nationwide Building Society data center in Swindon use?
We estimate the facility power at about 4 MW. Estimate from building footprint, low confidence.
How close is Nationwide Building Society data center in Swindon to the power grid?
The nearest high-voltage substation in OpenStreetMap is Swindon BSP (132 kV), about 1.5 km away.
How clean is the power for Nationwide Building Society data center in Swindon?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates Nationwide Building Society data center in Swindon?
Nationwide Building Society.
Data centers near Swindon
- Vodafone 2.4 km · 8.5 MW
- AWS Swindon Data Centre 7.3 km · 14 MW
- nLighten Swindon BRS2 8.1 km · 8 MW
- Ark Data Centres - Spring Park - SQ17, P1, P2, P3, P4, P5 31.3 km · 10 MW
- Data center in Neston 31.6 km · 3 MW
- Ark Data Centres 31.8 km · 6.2 MW
- R89 36.0 km · 2.1 MW
- Safehosts Cheltenham 39.0 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.