Vodafone
Vodafone is an operational data center in Swindon, United Kingdom. Our footprint estimate of its power is about 8.5 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 8.5 MW (range 4.2 MW to 14 MW) Estimate from building footprint, low confidence. Footprint estimate: about 7,070 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Whitehill Way, SN5 6LA, Swindon |
| Coordinates | 51.55151, -1.84714 |
Power and grid
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.7 °C (2001 to 2025) |
| Cooling degree days | 33 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.94 kWh per m² per day |
| Wind at 50 m | 7.2 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Vodafone use?
We estimate the facility power at about 8.5 MW. Estimate from building footprint, low confidence.
How clean is the power for Vodafone?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Data centers near Swindon
- Nationwide Building Society data center in Swindon 2.4 km · 4 MW
- AWS Swindon Data Centre 6.5 km · 14 MW
- nLighten Swindon BRS2 9.9 km · 8 MW
- Ark Data Centres - Spring Park - SQ17, P1, P2, P3, P4, P5 29.4 km · 10 MW
- Data center in Neston 29.8 km · 3 MW
- Ark Data Centres 29.9 km · 6.2 MW
- R89 36.8 km · 2.1 MW
- Stream Networks - Newbury 40.5 km
Sources
Correct this page or get the data