Data Center Directory

Data center in Neston

Data center in Neston is an operational data center in Neston, United Kingdom. Our footprint estimate of its power is about 3 MW.

Key facts

StatusOperational
Facility power3 MW (range 1.5 MW to 4.9 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,532 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates51.41743, -2.21948

Power and grid

Grid carbon intensity218 g CO₂ per kWh (United Kingdom, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2%

Climate and water

Average temperature10 °C
NASA POWER, average of 2001 to 2025.
Highest temperature34.7 °C (2001 to 2025)
Cooling degree days33 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.94 kWh per m² per day
Wind at 50 m7.2 m/s average
Water stress todayLow - Medium (10-20%) (England)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Neston use?

We estimate the facility power at about 3 MW. Estimate from building footprint, low confidence.

How clean is the power for Data center in Neston?

The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.

Data centers near Neston

Sources

Correct this page or get the data