Ascenty SP1
Ascenty SP1 is an operational data center operated by Digital Realty in Sao Domingos, Brazil. Our footprint estimate of its power is about 3.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Digital Realty |
| Facility power | 3.8 MW (range 1.9 MW to 6.2 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,204 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Ascenty SP3 |
| Address | Avenida Roberto Pinto Sobrinho |
| Coordinates | -23.49205, -46.77602 |
Power and grid
| Nearest high-voltage substation | Subestação Anhangüera, 345 kV, 800 m away (CTEEP) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 4 |
| Power plants within 50 km | 669 MW in 6 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 109 g CO₂ per kWh (Brazil, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.1%, wind 15.2%, solar 11.5%, bioenergy 8.1%, gas 7.8%. Clean power: 88.9% |
Climate and water
| Average temperature | 19.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.6 °C (2001 to 2025) |
| Cooling degree days | 955 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.53 kWh per m² per day |
| Wind at 50 m | 5 m/s average |
| Water stress today | Low - Medium (10-20%) (Brazil) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Ascenty SP1 use?
We estimate the facility power at about 3.8 MW. Estimate from building footprint, low confidence.
How close is Ascenty SP1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Subestação Anhangüera (345 kV), about 800 m away.
How clean is the power for Ascenty SP1?
The grid in Brazil emits about 109 g CO₂ per kWh (2025). Largest sources: hydro 52.1%, wind 15.2%, solar 11.5%.
Who operates Ascenty SP1?
Digital Realty.
Data centers near Sao Domingos
- Ascenty SPO01 - São Paulo 126 m · 11 MW
- Ascenty SP4 259 m · 12 MW
- Equinix SP4 Terremark 3.4 km
- Scala Data Centers SGRUTB03 3.5 km · 17 MW
- Scala Data Centers SGRUTB01 3.6 km
- NIC-NU (Nações Unidas) 3.8 km
- B-BRIX - SPO1 4.0 km
- Equinix SP4 - São Paulo 4.0 km · 1.9 MW
More Digital Realty data centers
- Digital Realty CH1 - Chicago United States
- Digital Realty IAD39 United States
- Digital Realty IAD51 United States
- Digital Realty IAD44 United States
- Digital Realty IAD41 United States
- Digital Realty Singapore SIN11 Singapore
- Digital Realty Toronto YYZ11 Canada
- Digital Realty IAD43 United States
Sources
Correct this page or get the data