Ascenty SP4 is an operational data center operated by Digital Realty in Sao Domingos, Brazil. Our footprint estimate of its power is about 12 MW.

Key facts

StatusOperational
OperatorDigital Realty
Facility power12 MW (range 5.8 MW to 19 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 9,745 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 5,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates-23.48983, -46.77526

Power and grid

Nearest high-voltage substationSubestação Anhangüera, 345 kV, 800 m away (CTEEP)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km4
Power plants within 50 km669 MW in 6 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity109 g CO₂ per kWh (Brazil, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 52.1%, wind 15.2%, solar 11.5%, bioenergy 8.1%, gas 7.8%. Clean power: 88.9%

Climate and water

Average temperature19.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.6 °C (2001 to 2025)
Cooling degree days955 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.53 kWh per m² per day
Wind at 50 m5 m/s average
Water stress todayLow - Medium (10-20%) (Brazil)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Ascenty SP4 use?

We estimate the facility power at about 12 MW. Estimate from building footprint, low confidence.

How close is Ascenty SP4 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Subestação Anhangüera (345 kV), about 800 m away.

How clean is the power for Ascenty SP4?

The grid in Brazil emits about 109 g CO₂ per kWh (2025). Largest sources: hydro 52.1%, wind 15.2%, solar 11.5%.

Who operates Ascenty SP4?

Digital Realty.

Data centers near Sao Domingos

More Digital Realty data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.