AZ Labs

AZ Labs is an operational data center in Queen Creek, United States. Our footprint estimate of its power is about 3.2 MW.

Key facts

StatusOperational
Facility power3.2 MW (range 1.6 MW to 5.1 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,649 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,400 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asL3Harris Technologies Inc
Coordinates33.30628, -111.67172

Power and grid

Nearest high-voltage substationScott Substation, 230 kV, 3.6 km away (Salt River Project)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km5
UtilityCity Of Mesa (municipal)
Electric retail service territory (HIFLD, US government).
Balancing authorityWALC
Nearest gas pipelineEl Paso Natural Gas Co, interstate pipeline, 8 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km7.2 GW in 29 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity311 g CO₂ per kWh (Arizona, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 43%, nuclear 25.6%, solar 17.5%, coal 7.5%, hydro 4.1%. Clean power: 49.8%
Industrial power priceUSD 0.097 per kWh (Arizona, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature19.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature45.5 °C (2001 to 2025)
Cooling degree days1,663 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.8 kWh per m² per day
Wind at 50 m4.4 m/s average
Water stress todayExtremely High (>80%) (Arizona)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does AZ Labs use?

We estimate the facility power at about 3.2 MW. Estimate from building footprint, low confidence.

How close is AZ Labs to the power grid?

The nearest high-voltage substation in OpenStreetMap is Scott Substation (230 kV), about 3.6 km away. The local utility is City Of Mesa, in the WALC balancing area.

How clean is the power for AZ Labs?

The grid in Arizona emits about 311 g CO₂ per kWh (2025). Largest sources: gas 43%, nuclear 25.6%, solar 17.5%.