BER12
BER12 is an operational data center in Ludwigsfelde, Germany. Our footprint estimate of its power is about 9.6 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 9.6 MW (range 4.8 MW to 15 MW) Estimate from building footprint, low confidence. Footprint estimate: about 8,002 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Uferring 7, 14974, Ludwigsfelde |
| Coordinates | 52.32306, 13.29289 |
Power and grid
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.2 °C (2001 to 2025) |
| Cooling degree days | 209 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.83 kWh per m² per day |
| Wind at 50 m | 6.6 m/s average |
| Water stress today | Medium - High (20-40%) (Brandenburg) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does BER12 use?
We estimate the facility power at about 9.6 MW. Estimate from building footprint, low confidence.
How clean is the power for BER12?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Data centers near Ludwigsfelde
- BER11 169 m · 12 MW
- Data center in Ludwigsfelde 238 m · 10 MW
- Webplus24 GmbH 8.7 km
- nLighten Berlin BER1 11.9 km
- Lumen Berlin 13.4 km
- NTT 14.0 km · 13 MW
- NTT Berlin 2 Data Center (BER2) 14.1 km
- Data center in Mariendorf 14.1 km · 3.4 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.