Data center in Ludwigsfelde is an operational data center in Ludwigsfelde, Germany. Our footprint estimate of its power is about 10 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 10 MW (range 5.1 MW to 16 MW) Estimate from building footprint, low confidence. Footprint estimate: about 8,471 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Uferring 6, 14974, Ludwigsfelde |
| Coordinates | 52.32332, 13.29636 |
Power and grid
| Nearest high-voltage substation | Umspannwerk Ludwigsfelde Eichspitze, 110 kV, 1.3 km away (E.DIS Netz) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Umspannwerk Thyrow, 220 kV, 10.3 km away |
| HV substations within 10 km | 10 |
| Power plants within 50 km | 3.1 GW in 48 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.2 °C (2001 to 2025) |
| Cooling degree days | 209 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.83 kWh per m² per day |
| Wind at 50 m | 6.6 m/s average |
| Water stress today | Medium - High (20-40%) (Brandenburg) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Ludwigsfelde use?
We estimate the facility power at about 10 MW. Estimate from building footprint, low confidence.
How close is Data center in Ludwigsfelde to the power grid?
The nearest high-voltage substation in OpenStreetMap is Umspannwerk Ludwigsfelde Eichspitze (110 kV), about 1.3 km away.
How clean is the power for Data center in Ludwigsfelde?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Data centers near Ludwigsfelde
- BER11 182 m · 12 MW
- BER12 238 m · 9.6 MW
- Webplus24 GmbH 8.5 km
- nLighten Berlin BER1 12.1 km
- Lumen Berlin 13.2 km
- NTT 13.9 km · 13 MW
- Data center in Mariendorf 13.9 km · 3.4 MW
- NTT Berlin 2 Data Center (BER2) 13.9 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.