Data Center Directory

BER11

BER11 is an operational data center operated by Vantage Data Centers in Ludwigsfelde, Germany. Our footprint estimate of its power is about 12 MW.

Key facts

StatusOperational
OperatorVantage Data Centers
Facility power12 MW (range 5.9 MW to 19 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 9,800 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 5,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressUferring 5, 14974, Ludwigsfelde
Coordinates52.32203, 13.29472
Websitevantage-dc.com/data-center-locations/emea/berlin-i-germany

Power and grid

Grid carbon intensity334 g CO₂ per kWh (Germany, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5%
Industrial power priceEUR 0.146 per kWh (Germany, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature9.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.2 °C (2001 to 2025)
Cooling degree days209 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.83 kWh per m² per day
Wind at 50 m6.6 m/s average
Water stress todayMedium - High (20-40%) (Brandenburg)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does BER11 use?

We estimate the facility power at about 12 MW. Estimate from building footprint, low confidence.

How clean is the power for BER11?

The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.

Who operates BER11?

Vantage Data Centers.

Data centers near Ludwigsfelde

More Vantage Data Centers data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.