nLighten Berlin BER1
nLighten Berlin BER1 is an operational data center operated by nLighten HQ in Kleinmachnow, Germany. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | nLighten HQ |
| Networks | 3 networks PeeringDB. |
| Also known as | ITENOS Berlin (BER1) |
| Address | Albert-Einstein-Ring 17-25 |
| Coordinates | 52.40864, 13.18684 |
| Website | nlighten.com/en/germany-data-center/berlin |
Power and grid
| Nearest high-voltage substation | Umspannwerk Schlachtensee, 110 kV, 3.3 km away (Stromnetz Berlin) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Umspannwerk Reuter, 380 kV, 14.3 km away |
| HV substations within 10 km | 17 |
| Power plants within 50 km | 3.2 GW in 50 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.7 °C (2001 to 2025) |
| Cooling degree days | 203 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.83 kWh per m² per day |
| Wind at 50 m | 6.5 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is nLighten Berlin BER1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Umspannwerk Schlachtensee (110 kV), about 3.3 km away.
How clean is the power for nLighten Berlin BER1?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Who operates nLighten Berlin BER1?
nLighten HQ.
Data centers near Kleinmachnow
- Rechenzentrum BER01 11.1 km · 4.6 MW
- BER12 11.9 km · 9.6 MW
- Data center in Ludwigsfelde 12.1 km · 10 MW
- BER11 12.1 km · 12 MW
- Virtus 12.7 km · 7.3 MW
- Vodafone data center in Mariendorf 12.7 km
- NTT Berlin 2 Data Center (BER2) 12.9 km
- Lumen Berlin 13.0 km
More nLighten HQ data centers
- nLighten Swindon BRS2 United Kingdom
- nLighten Leeds LBA1 United Kingdom
- nLighten Strasbourg SXB1 France
- nLighten Besancon MLH1 France
- nLighten Liverpool LPL1 United Kingdom
- nLighten Paris PAR2 France
- nLighten Sophia Antipolis NCE1 France
- nLighten Paris PAR1 France
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.