Blacknight BK0
Blacknight BK0 is an operational data center operated by Blacknight Internet Solutions in Carlow, Ireland. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Blacknight Internet Solutions |
| Networks | 2 networks PeeringDB. |
| Address | Unit 12a, Barrowside Business Park, Sleaty Road, Graiguecullen |
| Coordinates | 52.84218, -6.93569 |
| Website | blacknight.com |
Power and grid
| Nearest high-voltage substation | Carlow 110kV Substation, 110 kV, 6.2 km away (EirGrid) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Kellis 220kV Substation, 220 kV, 10 km away |
| HV substations within 10 km | 2 |
| Power plants within 50 km | 314 MW in 16 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 261 g CO₂ per kWh (Ireland, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.1%, wind 37.8%, solar 4.7%, bioenergy 3.3%, oil and other fossil 2.9%. Clean power: 47.8% |
| Industrial power price | EUR 0.206 per kWh (Ireland, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 8.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 25.9 °C (2001 to 2025) |
| Cooling degree days | 2 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.74 kWh per m² per day |
| Wind at 50 m | 7.5 m/s average |
| Water stress today | Low (<10%) (Ireland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Blacknight BK0 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Carlow 110kV Substation (110 kV), about 6.2 km away.
How clean is the power for Blacknight BK0?
The grid in Ireland emits about 261 g CO₂ per kWh (2025). Largest sources: gas 48.1%, wind 37.8%, solar 4.7%.
Who operates Blacknight BK0?
Blacknight Internet Solutions.
Data centers near Carlow
- Echelon Data Centres 50.9 km · 23 MW
- euNetworks (Global Voice) 60.8 km · 9.7 MW
- Equinix Dublin DB1 60.9 km · 4.7 MW
- Data center in Jobstown 61.1 km · 9.2 MW
- Equinix DB1 - Dublin, CityWest 61.2 km
- Eir Hosting Services 61.2 km · 4.6 MW
- Eircom Dublin (Citywest) 61.3 km
- Dave Geoghegan 61.4 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.