Bouygues Télécom data center in Saint-Priest
Bouygues Télécom data center in Saint-Priest is an operational data center operated by Bouygues Télécom in Saint-Priest, France. Our footprint estimate of its power is about 0.6 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Bouygues Télécom |
| Facility power | 0.6 MW (range 0.3 MW to 1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 516 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 260 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 45.68419, 4.94512 |
Power and grid
| Nearest high-voltage substation | Poste électrique de Mions, 400 kV, 2.6 km away (RTE) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 6 |
| Power plants within 50 km | 7.1 GW in 49 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.3 °C (2001 to 2025) |
| Cooling degree days | 227 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.74 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | Low - Medium (10-20%) (France) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Bouygues Télécom data center in Saint-Priest use?
We estimate the facility power at about 0.6 MW. Estimate from building footprint, low confidence.
How close is Bouygues Télécom data center in Saint-Priest to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste électrique de Mions (400 kV), about 2.6 km away.
How clean is the power for Bouygues Télécom data center in Saint-Priest?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates Bouygues Télécom data center in Saint-Priest?
Bouygues Télécom.
Data centers near Saint-Priest
- Free Pro - Datacenter Rock (LYO03) 7.4 km · 7 MW
- Free Pro - Lyon - Rock 7.6 km
- UltraEdge Lyon-Venissieux 7.7 km · 4.2 MW
- LASOTEL PIXEL 8.9 km
- ETIX Lyon #1 9.3 km
- Orange Lyon Lumière - Centrale 10.1 km · 53 MW
- Colt Lyon 10.3 km
- Datacenter RTE 10.8 km
More Bouygues Télécom data centers
- Datacenter Bouygues Télécom France
- Datacenter Bouygues Télécom France
- Bouygues Telecom data center in Cabriès France
- Bouygues Télécom data center in Montpellier France
- Bouygues Télécom data center in Poitiers France
- Bouygues Télécom data center in Toulouse France
- Bouygues Télécom data center in Léognan France
- Bouygues Télécom data center in Nanterre France
Sources
Correct this page or get the data