CA31
CA31 is an operational data center operated by Audi in Ingolstadt, Germany. Our footprint estimate of its power is about 7.2 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Audi |
| Facility power | 7.2 MW (range 3.6 MW to 12 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,039 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 48.75353, 11.47999 |
Power and grid
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
|---|---|
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CA31 use?
We estimate the facility power at about 7.2 MW. Estimate from building footprint, low confidence.
How clean is the power for CA31?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Who operates CA31?
Audi.
Data centers near Ingolstadt
- noris network AG ING1 ITA 104 m · 0.6 MW
- NTT Munich 2 Data Center (MUC2) 51.7 km
- EXA Edge DC Garching 56.2 km
- nLighten Munich MUC1 56.3 km
- LRZ SuperMUC-NG 56.4 km · 19 MW
- Rechenzentrum Garching 56.4 km · 1.6 MW
- Max-Planck-Gesellschaft Raven 56.5 km · 0.7 MW
- M-net Augsburg 59.6 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.