Data Center Directory

Cable & Wireless Cable Landing Station

Cable & Wireless Cable Landing Station is an operational data center in Shirley, United States. Our footprint estimate of its power is about 6 MW.

Key facts

StatusOperational
Facility power6 MW (range 3 MW to 9.6 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 5,001 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressRamsey Road 21, 11967, Shirley
Coordinates40.84365, -72.88338

Power and grid

Nearest high-voltage substationWildwood Substation, 115 kV, 11.5 km away (Long Island Power Authority)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
UtilityFishers Island Utility Co INC (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityISNE
Nearest gas pipelineIroquois Gas Trans Co, interstate pipeline, 33.2 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km6.9 GW in 38 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity268 g CO₂ per kWh (New York, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 45.4%, nuclear 20.7%, hydro 18.5%, solar 7.6%, wind 5%. Clean power: 52.9%
Industrial power priceUSD 0.105 per kWh (New York, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature11.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature36.1 °C (2001 to 2025)
Cooling degree days458 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.91 kWh per m² per day
Wind at 50 m5.9 m/s average
Water stress todayLow - Medium (10-20%) (New York)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Cable & Wireless Cable Landing Station use?

We estimate the facility power at about 6 MW. Estimate from building footprint, low confidence.

How close is Cable & Wireless Cable Landing Station to the power grid?

The nearest high-voltage substation in OpenStreetMap is Wildwood Substation (115 kV), about 11.5 km away. The local utility is Fishers Island Utility Co INC, in the ISNE balancing area.

How clean is the power for Cable & Wireless Cable Landing Station?

The grid in New York emits about 268 g CO₂ per kWh (2025). Largest sources: gas 45.4%, nuclear 20.7%, hydro 18.5%.