Cable & Wireless Cable Landing Station
Cable & Wireless Cable Landing Station is an operational data center in Shirley, United States. Our footprint estimate of its power is about 6 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 6 MW (range 3 MW to 9.6 MW) Estimate from building footprint, low confidence. Footprint estimate: about 5,001 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Ramsey Road 21, 11967, Shirley |
| Coordinates | 40.84365, -72.88338 |
Power and grid
| Nearest high-voltage substation | Wildwood Substation, 115 kV, 11.5 km away (Long Island Power Authority) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Utility | Fishers Island Utility Co INC (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | ISNE |
| Nearest gas pipeline | Iroquois Gas Trans Co, interstate pipeline, 33.2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 6.9 GW in 38 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 268 g CO₂ per kWh (New York, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.4%, nuclear 20.7%, hydro 18.5%, solar 7.6%, wind 5%. Clean power: 52.9% |
| Industrial power price | USD 0.105 per kWh (New York, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.1 °C (2001 to 2025) |
| Cooling degree days | 458 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.91 kWh per m² per day |
| Wind at 50 m | 5.9 m/s average |
| Water stress today | Low - Medium (10-20%) (New York) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Cable & Wireless Cable Landing Station use?
We estimate the facility power at about 6 MW. Estimate from building footprint, low confidence.
How close is Cable & Wireless Cable Landing Station to the power grid?
The nearest high-voltage substation in OpenStreetMap is Wildwood Substation (115 kV), about 11.5 km away. The local utility is Fishers Island Utility Co INC, in the ISNE balancing area.
How clean is the power for Cable & Wireless Cable Landing Station?
The grid in New York emits about 268 g CO₂ per kWh (2025). Largest sources: gas 45.4%, nuclear 20.7%, hydro 18.5%.
Data centers near Shirley
- Crown Castle Brentwood (1650 Islip) 29.1 km
- 365 Data Centers Commack (CNY) 34.4 km
- Aphorio Carter Trumbull Data Center 49.4 km · 32 MW
- Lumen West Haven 50.1 km
- Lumen New Haven 50.9 km
- CyrusOne data center in Norwalk 51.9 km · 13 MW
- CyrusOne Norwalk 52.5 km
- Data center in Wallingford 71.0 km · 4.9 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.