Crown Castle Brentwood (1650 Islip)
Crown Castle Brentwood (1650 Islip) is an operational data center operated by Crown Castle in Brentwood, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Crown Castle |
| Address | 1650 Islip Ave |
| Coordinates | 40.78418, -73.21986 |
| Website | crowncastle.com |
Power and grid
| Nearest high-voltage substation | Pilgrim Substation, 138 kV, 7.6 km away (Long Island Power Authority) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Duffy Avenue Converter Station, 230 kV, 28 km away |
| HV substations within 10 km | 1 |
| Utility | Fishers Island Utility Co INC (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | ISNE |
| Nearest gas pipeline | Brooklyn Union Gas Co, intrastate pipeline, 6.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 8.1 GW in 46 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 268 g CO₂ per kWh (New York, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.4%, nuclear 20.7%, hydro 18.5%, solar 7.6%, wind 5%. Clean power: 52.9% |
| Industrial power price | USD 0.105 per kWh (New York, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 11.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.1 °C (2001 to 2025) |
| Cooling degree days | 458 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.91 kWh per m² per day |
| Wind at 50 m | 5.9 m/s average |
| Water stress today | Low - Medium (10-20%) (New York) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Crown Castle Brentwood (1650 Islip) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Pilgrim Substation (138 kV), about 7.6 km away. The local utility is Fishers Island Utility Co INC, in the ISNE balancing area.
How clean is the power for Crown Castle Brentwood (1650 Islip)?
The grid in New York emits about 268 g CO₂ per kWh (2025). Largest sources: gas 45.4%, nuclear 20.7%, hydro 18.5%.
Who operates Crown Castle Brentwood (1650 Islip)?
Crown Castle.
Data centers near Brentwood
- 365 Data Centers Commack (CNY) 7.4 km
- 1025Connect 28.6 km
- Cable & Wireless Cable Landing Station 29.1 km · 6 MW
- 1101 Stewart Ave, Garden City 32.0 km
- 501 Franklin Ave 35.4 km
- CyrusOne data center in Norwalk 39.2 km · 13 MW
- CyrusOne Norwalk 39.3 km
- Lumen Stamford 39.4 km
More Crown Castle data centers
- Crown Castle Columbus (101 E Town) United States
- Crown Castle Hartford (960 Main) United States
- Crown Castle Manchester (1 Sundial Ave) United States
- Crown Castle Marlboro (34 St Martin) United States
- Crown Castle Philadelphia (1309 Noble) United States
- Crown Castle Pittsburgh (Allegheny Center Mall) United States
- Crown Castle Providence (235 Promenade) United States
- Crown Castle Providence (300 Carpenter) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.