CapitaLand Data Center
CapitaLand Data Center is an operational data center operated by CapitaLand in Ambattur, India. Our footprint estimate of its power is about 1.5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CapitaLand |
| Facility power | 1.5 MW (range 0.6 MW to 3.7 MW) Estimate from building footprint, low confidence. Footprint estimate: about 12,314 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 640 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 13.11145, 80.16034 |
Power and grid
| Nearest high-voltage substation | Korattur Sub Station, 220 kV, 2.6 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 7 |
| Power plants within 50 km | 4.0 GW in 6 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 666 g CO₂ per kWh (India, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 70%, solar 9.8%, hydro 8.5%, wind 5%, nuclear 2.6%. Clean power: 27.1% |
Climate and water
| Average temperature | 28 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.7 °C (2001 to 2025) |
| Cooling degree days | 3,708 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.22 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Extremely High (>80%) (Tamil Nadu) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CapitaLand Data Center use?
We estimate the facility power at about 1.5 MW. Estimate from building footprint, low confidence.
How close is CapitaLand Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is Korattur Sub Station (220 kV), about 2.6 km away.
How clean is the power for CapitaLand Data Center?
The grid in India emits about 666 g CO₂ per kWh (2025). Largest sources: coal 70%, solar 9.8%, hydro 8.5%.
Who operates CapitaLand Data Center?
CapitaLand.
Data centers near Ambattur
- CtrlS Data Center Chennai 467 m · 103 MW
- CtrlS Chennai DC1 549 m
- Digital Connexion MAA10 Chennai (Ambattur) 1.3 km
- Digital Connexion DC 1.3 km · 3.2 MW
- NTT CNN2A 1.4 km
- Iron Mountain Data Center 1.5 km · 2.1 MW
- NTT 1.5 km · 19 MW
- Colt Data Center 2.2 km · 43 MW
More CapitaLand data centers
- CapitaLand data center in Singapore Singapore
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.