Digital Connexion DC
Digital Connexion DC is an operational data center operated by Reliance in Ambattur, India. Our footprint estimate of its power is about 3.2 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Reliance |
| Facility power | 3.2 MW (range 1.6 MW to 5.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,663 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 13.10032, 80.16441 |
Power and grid
| Nearest high-voltage substation | Korattur Sub Station, 220 kV, 1.8 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 7 |
| Power plants within 50 km | 4.0 GW in 6 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 666 g CO₂ per kWh (India, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 70%, solar 9.8%, hydro 8.5%, wind 5%, nuclear 2.6%. Clean power: 27.1% |
Climate and water
| Average temperature | 28 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.7 °C (2001 to 2025) |
| Cooling degree days | 3,708 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.22 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Extremely High (>80%) (Tamil Nadu) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Digital Connexion DC use?
We estimate the facility power at about 3.2 MW. Estimate from building footprint, low confidence.
How close is Digital Connexion DC to the power grid?
The nearest high-voltage substation in OpenStreetMap is Korattur Sub Station (220 kV), about 1.8 km away.
How clean is the power for Digital Connexion DC?
The grid in India emits about 666 g CO₂ per kWh (2025). Largest sources: coal 70%, solar 9.8%, hydro 8.5%.
Who operates Digital Connexion DC?
Reliance.
Data centers near Ambattur
- Digital Connexion MAA10 Chennai (Ambattur) 67 m
- NTT CNN2A 153 m
- NTT 295 m · 19 MW
- Iron Mountain Data Center 413 m · 2.1 MW
- CtrlS Chennai DC1 787 m
- CtrlS Data Center Chennai 863 m · 103 MW
- Colt Data Center 995 m · 43 MW
- CapitaLand Data Center 1.3 km · 1.5 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.