Iron Mountain Data Center
Iron Mountain Data Center is an operational data center operated by Iron Mountain in Ambattur, India. Our footprint estimate of its power is about 2.1 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Iron Mountain |
| Facility power | 2.1 MW (range 0.8 MW to 5.2 MW) Estimate from building footprint, low confidence. Footprint estimate: about 17,346 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 900 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | CHN-1 DC · CHN-2 DC |
| Coordinates | 13.10048, 80.16822 |
Power and grid
| Nearest high-voltage substation | Korattur Sub Station, 220 kV, 1.4 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 7 |
| Power plants within 50 km | 4.0 GW in 6 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 666 g CO₂ per kWh (India, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 70%, solar 9.8%, hydro 8.5%, wind 5%, nuclear 2.6%. Clean power: 27.1% |
Climate and water
| Average temperature | 28 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.7 °C (2001 to 2025) |
| Cooling degree days | 3,708 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.22 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Extremely High (>80%) (Tamil Nadu) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Iron Mountain Data Center use?
We estimate the facility power at about 2.1 MW. Estimate from building footprint, low confidence.
How close is Iron Mountain Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is Korattur Sub Station (220 kV), about 1.4 km away.
How clean is the power for Iron Mountain Data Center?
The grid in India emits about 666 g CO₂ per kWh (2025). Largest sources: coal 70%, solar 9.8%, hydro 8.5%.
Who operates Iron Mountain Data Center?
Iron Mountain.
Data centers near Ambattur
- NTT 226 m · 19 MW
- NTT CNN2A 260 m
- Digital Connexion DC 413 m · 3.2 MW
- Digital Connexion MAA10 Chennai (Ambattur) 454 m
- CtrlS Chennai DC1 942 m
- CtrlS Data Center Chennai 1.0 km · 103 MW
- Colt Data Center 1.1 km · 43 MW
- CapitaLand Data Center 1.5 km · 1.5 MW
More Iron Mountain data centers
- Iron Mountain Data Center - New Jersey (NJE-1) United States
- Iron Mountain data center in Sandston United States
- Iron Mountain Data Center - Manassas (VA-1) United States
- Iron Mountain FRA-1 Germany
- Iron Mountain VA-3 United States
- Iron Mountain Data Center - Manassas (VA-2) United States
- Iron Mountain VA-7 United States
- Iron Mountain Data Center - London (LON-1) United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.