CtrlS Data Center Chennai
CtrlS Data Center Chennai is an operational data center operated by CtrlS in Ambattur, India. Our footprint estimate of its power is about 103 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CtrlS |
| Facility power | 103 MW (range 52 MW to 165 MW) Estimate from building footprint, low confidence. Footprint estimate: about 14,366 m² building outline x 6 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 44,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 13.10788, 80.16262 |
| Website | ctrls.com/datacenter-chennai |
Power and grid
| Grid carbon intensity | 666 g CO₂ per kWh (India, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | coal 70%, solar 9.8%, hydro 8.5%, wind 5%, nuclear 2.6%. Clean power: 27.1% |
Climate and water
| Average temperature | 28 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.7 °C (2001 to 2025) |
| Cooling degree days | 3,708 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.22 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Extremely High (>80%) (Tamil Nadu) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CtrlS Data Center Chennai use?
We estimate the facility power at about 103 MW. Estimate from building footprint, low confidence.
How clean is the power for CtrlS Data Center Chennai?
The grid in India emits about 666 g CO₂ per kWh (2025). Largest sources: coal 70%, solar 9.8%, hydro 8.5%.
Who operates CtrlS Data Center Chennai?
CtrlS.
Data centers near Ambattur
- CtrlS Chennai DC1 81 m
- CapitaLand Data Center 467 m · 1.5 MW
- Digital Connexion MAA10 Chennai (Ambattur) 803 m
- Digital Connexion DC 863 m · 3.2 MW
- NTT CNN2A 900 m
- Iron Mountain Data Center 1.0 km · 2.1 MW
- NTT 1.1 km · 19 MW
- Colt Data Center 1.8 km · 43 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.