NTT
NTT is an operational data center operated by NTT Global Data Centers in Ambattur, India. Our footprint estimate of its power is about 19 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | NTT Global Data Centers |
| Facility power | 19 MW (range 9.6 MW to 31 MW) Estimate from building footprint, low confidence. Footprint estimate: about 15,948 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 8,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | NTT DC building 2 · NTT DC building 1 |
| Coordinates | 13.09901, 80.16678 |
Power and grid
| Grid carbon intensity | 666 g CO₂ per kWh (India, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | coal 70%, solar 9.8%, hydro 8.5%, wind 5%, nuclear 2.6%. Clean power: 27.1% |
Climate and water
| Average temperature | 28 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.7 °C (2001 to 2025) |
| Cooling degree days | 3,708 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.22 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | Extremely High (>80%) (Tamil Nadu) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NTT use?
We estimate the facility power at about 19 MW. Estimate from building footprint, low confidence.
How clean is the power for NTT?
The grid in India emits about 666 g CO₂ per kWh (2025). Largest sources: coal 70%, solar 9.8%, hydro 8.5%.
Who operates NTT?
NTT Global Data Centers.
Data centers near Ambattur
- NTT CNN2A 187 m
- Iron Mountain Data Center 226 m · 2.1 MW
- Digital Connexion DC 295 m · 3.2 MW
- Digital Connexion MAA10 Chennai (Ambattur) 357 m
- Colt Data Center 922 m · 43 MW
- CtrlS Chennai DC1 1.0 km
- CtrlS Data Center Chennai 1.1 km · 103 MW
- CapitaLand Data Center 1.5 km · 1.5 MW
More NTT Global Data Centers data centers
- NTT VA10 United States
- NTT Frankfurt 2 Data Center (FRA2) Germany
- NTT PH1 Datacenter United States
- NTT Japan
- NTTData Data Center United States
- NTT Hemel Hempstead 4 Data Center (HH4) United Kingdom
- NTT Berlin 1 Data Center (BER1) Germany
- NTT London 1 United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.