Centro de datos Triara
Centro de datos Triara is an operational data center operated by Triara in Ciudad Apodaca, Mexico. Our footprint estimate of its power is about 5.4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Triara |
| Facility power | 5.4 MW (range 2.1 MW to 13 MW) Estimate from building footprint, low confidence. Footprint estimate: about 44,728 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 2,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 25.78421, -100.17958 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 115 kV, 100 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Union Carbide, 230 kV, 800 m away |
| HV substations within 10 km | 34 |
| Power plants within 50 km | 5.3 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 481 g CO₂ per kWh (Mexico, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 70%, hydro 7.5%, solar 7%, wind 5.6%, coal 3.3%. Clean power: 24.2% |
Climate and water
| Average temperature | 22.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 45.4 °C (2001 to 2025) |
| Cooling degree days | 2,200 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.17 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | High (40-80%) (Mexico) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Centro de datos Triara use?
We estimate the facility power at about 5.4 MW. Estimate from building footprint, low confidence.
How close is Centro de datos Triara to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 100 m away.
How clean is the power for Centro de datos Triara?
The grid in Mexico emits about 481 g CO₂ per kWh (2025). Largest sources: gas 70%, hydro 7.5%, solar 7%.
Who operates Centro de datos Triara?
Triara.
Data centers near Ciudad Apodaca
- Triara Monterey 76 m
- Centro de datos Equinix MO1 2.4 km · 0.7 MW
- Equinix MO1 - Monterrey 5.6 km
- Equinix MO2 - Monterrey 8.0 km · 2.6 MW
- Neutral Networks Monterrey (MTY-NN) 19.0 km
- KIO Monterrey 1 (MTY1) 23.4 km
More Triara data centers
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.