Equinix MO1 - Monterrey
Equinix MO1 - Monterrey is an operational data center operated by Equinix in Apodaca, Mexico. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Networks | 11 networks PeeringDB. |
| Address | Parque Industrial Kalos de Alta Tecnología, Carretera Miguel Alemán Km 17, Street: 112 Aristoteles Avenue |
| Coordinates | 25.73817, -100.20344 |
| Website | equinix.lat |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 115 kV, 1.6 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Monterrey potencia, 400 kV, 3 km away |
| HV substations within 10 km | 50 |
| Power plants within 50 km | 5.3 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 481 g CO₂ per kWh (Mexico, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 70%, hydro 7.5%, solar 7%, wind 5.6%, coal 3.3%. Clean power: 24.2% |
Climate and water
| Average temperature | 21.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 43.4 °C (2001 to 2025) |
| Cooling degree days | 1,809 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.14 kWh per m² per day |
| Wind at 50 m | 4.4 m/s average |
| Water stress today | High (40-80%) (Mexico) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Equinix MO1 - Monterrey to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 1.6 km away.
How clean is the power for Equinix MO1 - Monterrey?
The grid in Mexico emits about 481 g CO₂ per kWh (2025). Largest sources: gas 70%, hydro 7.5%, solar 7%.
Who operates Equinix MO1 - Monterrey?
Equinix.
Data centers near Apodaca
- Centro de datos Equinix MO1 3.3 km · 0.7 MW
- Triara Monterey 5.6 km
- Centro de datos Triara 5.6 km · 5.4 MW
- Equinix MO2 - Monterrey 7.2 km · 2.6 MW
- Neutral Networks Monterrey (MTY-NN) 13.9 km
- KIO Monterrey 1 (MTY1) 18.4 km
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.