Data Center Directory

Centro de datos Equinix MO1

Centro de datos Equinix MO1 is an operational data center operated by Equinix in Ciudad Apodaca, Mexico. Our footprint estimate of its power is about 0.7 MW.

Key facts

StatusOperational
OperatorEquinix
Facility power0.7 MW (range 0.3 MW to 1.6 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 5,463 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates25.76669, -100.19333

Power and grid

Nearest high-voltage substationUnnamed substation, 115 kV, 1 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnion Carbide, 230 kV, 2 km away
HV substations within 10 km38
Power plants within 50 km5.3 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity481 g CO₂ per kWh (Mexico, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 70%, hydro 7.5%, solar 7%, wind 5.6%, coal 3.3%. Clean power: 24.2%

Climate and water

Average temperature22.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature45.4 °C (2001 to 2025)
Cooling degree days2,200 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.17 kWh per m² per day
Wind at 50 m5.3 m/s average
Water stress todayHigh (40-80%) (Mexico)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Centro de datos Equinix MO1 use?

We estimate the facility power at about 0.7 MW. Estimate from building footprint, low confidence.

How close is Centro de datos Equinix MO1 to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 1 km away.

How clean is the power for Centro de datos Equinix MO1?

The grid in Mexico emits about 481 g CO₂ per kWh (2025). Largest sources: gas 70%, hydro 7.5%, solar 7%.

Who operates Centro de datos Equinix MO1?

Equinix.

Data centers near Ciudad Apodaca

More Equinix data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.