Equinix MO2 - Monterrey
Equinix MO2 - Monterrey is an operational data center operated by Equinix in Apodaca, Mexico. Our footprint estimate of its power is about 2.6 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Facility power | 2.6 MW (range 1 MW to 6.4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 21,300 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 1,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 4 networks PeeringDB. |
| Also known as | Centro de datos Equinix MO2 |
| Address | Autopista al Aeropuerto 40 - Apodaca, Nexxus Aeropuerto Industrial Park |
| Coordinates | 25.72546, -100.13285 |
| Website | equinix.lat |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 115 kV, 1.6 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Huinalá, 400 kV, 3.1 km away |
| HV substations within 10 km | 42 |
| Power plants within 50 km | 5.3 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 481 g CO₂ per kWh (Mexico, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 70%, hydro 7.5%, solar 7%, wind 5.6%, coal 3.3%. Clean power: 24.2% |
Climate and water
| Average temperature | 21.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 43.4 °C (2001 to 2025) |
| Cooling degree days | 1,809 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.14 kWh per m² per day |
| Wind at 50 m | 4.4 m/s average |
| Water stress today | High (40-80%) (Mexico) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Equinix MO2 - Monterrey use?
We estimate the facility power at about 2.6 MW. Estimate from building footprint, low confidence.
How close is Equinix MO2 - Monterrey to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (115 kV), about 1.6 km away.
How clean is the power for Equinix MO2 - Monterrey?
The grid in Mexico emits about 481 g CO₂ per kWh (2025). Largest sources: gas 70%, hydro 7.5%, solar 7%.
Who operates Equinix MO2 - Monterrey?
Equinix.
Data centers near Apodaca
- Equinix MO1 - Monterrey 7.2 km
- Centro de datos Equinix MO1 7.6 km · 0.7 MW
- Centro de datos Triara 8.0 km · 5.4 MW
- Triara Monterey 8.1 km
- Neutral Networks Monterrey (MTY-NN) 19.5 km
- KIO Monterrey 1 (MTY1) 24.2 km
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data