Chick-fil-A Hiring Center
Chick-fil-A Hiring Center is an operational data center operated by Dennis Sampier in Sterling Heights, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Dennis Sampier |
| Coordinates | 42.62794, -82.98839 |
Power and grid
| Nearest high-voltage substation | Malta Substation, 120 kV, 800 m away (DTE Energy) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Bismarck Substation, 345 kV, 3.8 km away |
| HV substations within 10 km | 19 |
| Utility | Dte Electric Company (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | MISO |
| Nearest gas pipeline | Michcon Gas Co, intrastate pipeline, 3.3 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 7.1 GW in 24 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 455 g CO₂ per kWh (Michigan, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 42%, coal 23.2%, nuclear 21.7%, wind 8%, solar 2.6%. Clean power: 34.5% |
| Industrial power price | USD 0.090 per kWh (Michigan, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.7 °C (2001 to 2025) |
| Cooling degree days | 351 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.78 kWh per m² per day |
| Wind at 50 m | 6.9 m/s average |
| Water stress today | Low - Medium (10-20%) (Michigan) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Chick-fil-A Hiring Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is Malta Substation (120 kV), about 800 m away. The local utility is Dte Electric Company, in the MISO balancing area.
How clean is the power for Chick-fil-A Hiring Center?
The grid in Michigan emits about 455 g CO₂ per kWh (2025). Largest sources: gas 42%, coal 23.2%, nuclear 21.7%.
Who operates Chick-fil-A Hiring Center?
Dennis Sampier.
Data centers near Sterling Heights
- ManagedWay TYM2 13.2 km
- ManagedWay TYM1 13.6 km
- Liberty Center One 18.7 km · 2.4 MW
- Tesla 10k H100 Cluster 24.2 km · 15 MW
- 123.NET - DC1 - 24700 Northwestern Hwy. 26.8 km
- ManagedWay SFJ2 27.0 km
- 365 Data Centers Detroit (DT1) 28.3 km
- EdgeConneX Detroit (EDCDET01) 30.0 km · 6.5 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.