Connect Des Moines
Connect Des Moines is an operational data center operated by Connect Des Moines in Des Moines, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Connect Des Moines |
| Networks | 10 networks, 2 internet exchanges PeeringDB. |
| Also known as | Cologix DSM1 |
| Address | 666 Walnut Street |
| Coordinates | 41.58553, -93.62542 |
| Website | connectdsm.com |
Power and grid
| Utility | Midamerican Energy Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | MISO |
| Nearest gas pipeline | Northern Natural Gas Co, interstate pipeline, 2.2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 313 g CO₂ per kWh (Iowa, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 58.5%, coal 25.6%, gas 11.6%, solar 2.5%, hydro 1.4%. Clean power: 62.8% |
| Industrial power price | USD 0.093 per kWh (Iowa, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 10.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.6 °C (2001 to 2025) |
| Cooling degree days | 586 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.09 kWh per m² per day |
| Wind at 50 m | 6.9 m/s average |
| Water stress today | Low - Medium (10-20%) (Iowa) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Connect Des Moines?
The grid in Iowa emits about 313 g CO₂ per kWh (2025). Largest sources: wind 58.5%, coal 25.6%, gas 11.6%.
Who operates Connect Des Moines?
Connect Des Moines.
Data centers near Des Moines
- Microsoft GPT-4 cluster 112 m · 21 MW
- Aureon Downtown 537 m · 2.7 MW
- Data center in Pleasant Hill 8.6 km · 2.3 MW
- Aureon West Des Moines 9.2 km
- Microsoft 9.8 km · 13 MW
- Project Alluvion 10.1 km · 56 MW
- Project Ginger East 11.1 km · 67 MW
- Facebook Altoona Data Center 1 12.7 km · 49 MW
More Connect Des Moines data centers
- Connect Cedar Valley United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.