Microsoft GPT-4 cluster
Microsoft GPT-4 cluster is an operational AI data center operated by Microsoft in Des Moines, United States. Its power is about 21 MW. Epoch AI estimates about 7,883 H100-equivalent AI chips (NVIDIA A100).
Key facts
| Status | Operational |
|---|---|
| Operator | Microsoft |
| Facility power | 21 MW Reported (Epoch AI or owner data) |
| AI compute | 7,883 H100-equivalents |
| AI chips | NVIDIA A100 Reported (Epoch AI or owner data) |
| Chip count | 25,000 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 9,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Des Moines, Iowa |
| Coordinates | 41.58500, -93.62427 |
Power and grid
| Nearest high-voltage substation | MLK Substation, 161 kV, 300 m away (MidAmerican Energy) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Greater Des Moines Energy Center Substation, 345 kV, 8.8 km away |
| HV substations within 10 km | 10 |
| Utility | Midamerican Energy Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | MISO |
| Nearest gas pipeline | Northern Natural Gas Co, interstate pipeline, 2.1 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 1.3 GW in 12 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 313 g CO₂ per kWh (Iowa, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 58.5%, coal 25.6%, gas 11.6%, solar 2.5%, hydro 1.4%. Clean power: 62.8% |
| Industrial power price | USD 0.093 per kWh (Iowa, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 10.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.6 °C (2001 to 2025) |
| Cooling degree days | 586 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.09 kWh per m² per day |
| Wind at 50 m | 6.9 m/s average |
| Water stress today | Low - Medium (10-20%) (Iowa) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| Microsoft GPT-4 cluster | NVIDIA A100 | 25,000 | 21 MW | 2022-04-30 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft GPT-4 cluster use?
Public data puts the facility power at about 21 MW. Reported (Epoch AI or owner data).
What chips does Microsoft GPT-4 cluster use?
Reported chips: NVIDIA A100.
How close is Microsoft GPT-4 cluster to the power grid?
The nearest high-voltage substation in OpenStreetMap is MLK Substation (161 kV), about 300 m away. The local utility is Midamerican Energy Co, in the MISO balancing area.
How clean is the power for Microsoft GPT-4 cluster?
The grid in Iowa emits about 313 g CO₂ per kWh (2025). Largest sources: wind 58.5%, coal 25.6%, gas 11.6%.
Who operates Microsoft GPT-4 cluster?
Microsoft.
Data centers near Des Moines
- Connect Des Moines 112 m
- Aureon Downtown 649 m · 2.7 MW
- Data center in Pleasant Hill 8.5 km · 2.3 MW
- Aureon West Des Moines 9.3 km
- Microsoft 9.8 km · 13 MW
- Project Alluvion 10.1 km · 56 MW
- Project Ginger East 11.1 km · 67 MW
- Facebook Altoona Data Center 1 12.7 km · 49 MW
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.