Microsoft GPT-4 cluster

Microsoft GPT-4 cluster is an operational AI data center operated by Microsoft in Des Moines, United States. Its power is about 21 MW. Epoch AI estimates about 7,883 H100-equivalent AI chips (NVIDIA A100).

Key facts

StatusOperational
OperatorMicrosoft
Facility power21 MW
Reported (Epoch AI or owner data)
AI compute7,883 H100-equivalents
AI chipsNVIDIA A100
Reported (Epoch AI or owner data)
Chip count25,000
Largest reported cluster at this site (Epoch AI).
GPU capacity if all AIabout 9,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressDes Moines, Iowa
Coordinates41.58500, -93.62427

Power and grid

Nearest high-voltage substationMLK Substation, 161 kV, 300 m away (MidAmerican Energy)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationGreater Des Moines Energy Center Substation, 345 kV, 8.8 km away
HV substations within 10 km10
UtilityMidamerican Energy Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityMISO
Nearest gas pipelineNorthern Natural Gas Co, interstate pipeline, 2.1 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km1.3 GW in 12 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity313 g CO₂ per kWh (Iowa, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 58.5%, coal 25.6%, gas 11.6%, solar 2.5%, hydro 1.4%. Clean power: 62.8%
Industrial power priceUSD 0.093 per kWh (Iowa, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature10.2 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.6 °C (2001 to 2025)
Cooling degree days586 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.09 kWh per m² per day
Wind at 50 m6.9 m/s average
Water stress todayLow - Medium (10-20%) (Iowa)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

GPU clusters at this site

ClusterChipsCountPowerSince
Microsoft GPT-4 clusterNVIDIA A10025,00021 MW2022-04-30

Source: Epoch AI GPU Clusters.

Satellite view

Questions

How much power does Microsoft GPT-4 cluster use?

Public data puts the facility power at about 21 MW. Reported (Epoch AI or owner data).

What chips does Microsoft GPT-4 cluster use?

Reported chips: NVIDIA A100.

How close is Microsoft GPT-4 cluster to the power grid?

The nearest high-voltage substation in OpenStreetMap is MLK Substation (161 kV), about 300 m away. The local utility is Midamerican Energy Co, in the MISO balancing area.

How clean is the power for Microsoft GPT-4 cluster?

The grid in Iowa emits about 313 g CO₂ per kWh (2025). Largest sources: wind 58.5%, coal 25.6%, gas 11.6%.

Who operates Microsoft GPT-4 cluster?

Microsoft.