Data Center 2 Bilbao Arasur is an operational data center operated by Merlin Properties in Miranda de Ebro, Spain. Our footprint estimate of its power is about 61 MW.

Key facts

StatusOperational
OperatorMerlin Properties
Facility power61 MW (range 31 MW to 98 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 16,985 m² building outline x 3 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 26,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asData Center 3 Bilbao Arasur
Coordinates42.69876, -2.90748

Power and grid

Nearest high-voltage substationMiranda 220kv, 220 kV, 1.2 km away (Red Eléctrica de España)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km1
Power plants within 50 km358 MW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity154 g CO₂ per kWh (Spain, 2025)
Average of all power made in the area. Ember.
Grid power mixsolar 21.9%, gas 21.5%, wind 20.4%, nuclear 18.8%, hydro 11.4%. Clean power: 74.6%
Industrial power priceEUR 0.105 per kWh (Spain, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature11 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37.8 °C (2001 to 2025)
Cooling degree days207 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4 kWh per m² per day
Wind at 50 m5.7 m/s average
Water stress todayHigh (40-80%) (Spain)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data Center 2 Bilbao Arasur use?

We estimate the facility power at about 61 MW. Estimate from building footprint, low confidence.

How close is Data Center 2 Bilbao Arasur to the power grid?

The nearest high-voltage substation in OpenStreetMap is Miranda 220kv (220 kV), about 1.2 km away.

How clean is the power for Data Center 2 Bilbao Arasur?

The grid in Spain emits about 154 g CO₂ per kWh (2025). Largest sources: solar 21.9%, gas 21.5%, wind 20.4%.

Who operates Data Center 2 Bilbao Arasur?

Merlin Properties.

Data centers near Miranda de Ebro

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.