Data center in Miranda de Ebro
Data center in Miranda de Ebro is an operational data center in Miranda de Ebro, Spain. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Coordinates | 42.69943, -2.90352 |
Power and grid
| Nearest high-voltage substation | Miranda 220kv, 220 kV, 1.5 km away (Red Eléctrica de España) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 1 |
| Power plants within 50 km | 358 MW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 154 g CO₂ per kWh (Spain, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 21.9%, gas 21.5%, wind 20.4%, nuclear 18.8%, hydro 11.4%. Clean power: 74.6% |
| Industrial power price | EUR 0.105 per kWh (Spain, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 11 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.8 °C (2001 to 2025) |
| Cooling degree days | 207 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4 kWh per m² per day |
| Wind at 50 m | 5.7 m/s average |
| Water stress today | High (40-80%) (Spain) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Data center in Miranda de Ebro to the power grid?
The nearest high-voltage substation in OpenStreetMap is Miranda 220kv (220 kV), about 1.5 km away.
How clean is the power for Data center in Miranda de Ebro?
The grid in Spain emits about 154 g CO₂ per kWh (2025). Largest sources: solar 21.9%, gas 21.5%, wind 20.4%.
Data centers near Miranda de Ebro
- Data Center 2 Bilbao Arasur 332 m · 61 MW
- MERLIN Edged BIL03 - Bilbao-Arasur 583 m · 36 MW
- EXA Edge DC Basauri 58.9 km
- Mozoilo AJVP 60.4 km
- Telxius Derio DC 66.5 km
- Data center in Zamudio 66.7 km · 2.2 MW
- Ibercom San Sebastian 98.5 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.