Data center in Zamudio
Data center in Zamudio is an operational data center in Zamudio, Spain. Our footprint estimate of its power is about 2.2 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 2.2 MW (range 1.1 MW to 3.6 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,858 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 940 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Astondo bidea 605, 48170, Zamudio |
| Coordinates | 43.29888, -2.86875 |
Power and grid
| Nearest high-voltage substation | Zamudioko, 220 kV, 500 m away (Iberdrola) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 12 |
| Power plants within 50 km | 2.0 GW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 154 g CO₂ per kWh (Spain, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 21.9%, gas 21.5%, wind 20.4%, nuclear 18.8%, hydro 11.4%. Clean power: 74.6% |
| Industrial power price | EUR 0.105 per kWh (Spain, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 15 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36 °C (2001 to 2025) |
| Cooling degree days | 270 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.65 kWh per m² per day |
| Wind at 50 m | 6 m/s average |
| Water stress today | High (40-80%) (Spain) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Zamudio use?
We estimate the facility power at about 2.2 MW. Estimate from building footprint, low confidence.
How close is Data center in Zamudio to the power grid?
The nearest high-voltage substation in OpenStreetMap is Zamudioko (220 kV), about 500 m away.
How clean is the power for Data center in Zamudio?
The grid in Spain emits about 154 g CO₂ per kWh (2025). Largest sources: solar 21.9%, gas 21.5%, wind 20.4%.
Data centers near Zamudio
- Telxius Derio DC 249 m
- Mozoilo AJVP 6.3 km
- EXA Edge DC Basauri 7.8 km
- Data center in Miranda de Ebro 66.7 km
- Data Center 2 Bilbao Arasur 66.8 km · 61 MW
- MERLIN Edged BIL03 - Bilbao-Arasur 66.9 km · 36 MW
- Ibercom San Sebastian 69.6 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.