MERLIN Edged BIL03 - Bilbao-Arasur
MERLIN Edged BIL03 - Bilbao-Arasur is an operational data center operated by MERLIN Edged in Rivabellosa, Spain. Our footprint estimate of its power is about 36 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | MERLIN Edged |
| Facility power | 36 MW (range 18 MW to 58 MW) Estimate from building footprint, low confidence. Footprint estimate: about 10,122 m² building outline x 3 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 15,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 1 networks PeeringDB. |
| Also known as | Data Center Bilbao Arasur |
| Address | Avenida Ribera Baja S/N |
| Coordinates | 42.69831, -2.91050 |
| Website | edged.es/bilbao-arasur |
Power and grid
| Nearest high-voltage substation | Miranda 220kv, 220 kV, 900 m away (Red Eléctrica de España) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 1 |
| Power plants within 50 km | 358 MW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 154 g CO₂ per kWh (Spain, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 21.9%, gas 21.5%, wind 20.4%, nuclear 18.8%, hydro 11.4%. Clean power: 74.6% |
| Industrial power price | EUR 0.105 per kWh (Spain, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 11 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.8 °C (2001 to 2025) |
| Cooling degree days | 207 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4 kWh per m² per day |
| Wind at 50 m | 5.7 m/s average |
| Water stress today | High (40-80%) (Spain) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does MERLIN Edged BIL03 - Bilbao-Arasur use?
We estimate the facility power at about 36 MW. Estimate from building footprint, low confidence.
How close is MERLIN Edged BIL03 - Bilbao-Arasur to the power grid?
The nearest high-voltage substation in OpenStreetMap is Miranda 220kv (220 kV), about 900 m away.
How clean is the power for MERLIN Edged BIL03 - Bilbao-Arasur?
The grid in Spain emits about 154 g CO₂ per kWh (2025). Largest sources: solar 21.9%, gas 21.5%, wind 20.4%.
Who operates MERLIN Edged BIL03 - Bilbao-Arasur?
MERLIN Edged.
Data centers near Rivabellosa
- Data Center 2 Bilbao Arasur 251 m · 61 MW
- Data center in Miranda de Ebro 583 m
- EXA Edge DC Basauri 59.1 km
- Mozoilo AJVP 60.5 km
- Telxius Derio DC 66.6 km
- Data center in Zamudio 66.9 km · 2.2 MW
- Ibercom San Sebastian 99.0 km
More MERLIN Edged data centers
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.