Data Center Directory

MERLIN Edged BIL03 - Bilbao-Arasur

MERLIN Edged BIL03 - Bilbao-Arasur is an operational data center operated by MERLIN Edged in Rivabellosa, Spain. Our footprint estimate of its power is about 36 MW.

Key facts

StatusOperational
OperatorMERLIN Edged
Facility power36 MW (range 18 MW to 58 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 10,122 m² building outline x 3 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 15,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks1 networks
PeeringDB.
Also known asData Center Bilbao Arasur
AddressAvenida Ribera Baja S/N
Coordinates42.69831, -2.91050
Websiteedged.es/bilbao-arasur

Power and grid

Nearest high-voltage substationMiranda 220kv, 220 kV, 900 m away (Red Eléctrica de España)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km1
Power plants within 50 km358 MW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity154 g CO₂ per kWh (Spain, 2025)
Average of all power made in the area. Ember.
Grid power mixsolar 21.9%, gas 21.5%, wind 20.4%, nuclear 18.8%, hydro 11.4%. Clean power: 74.6%
Industrial power priceEUR 0.105 per kWh (Spain, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature11 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37.8 °C (2001 to 2025)
Cooling degree days207 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4 kWh per m² per day
Wind at 50 m5.7 m/s average
Water stress todayHigh (40-80%) (Spain)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does MERLIN Edged BIL03 - Bilbao-Arasur use?

We estimate the facility power at about 36 MW. Estimate from building footprint, low confidence.

How close is MERLIN Edged BIL03 - Bilbao-Arasur to the power grid?

The nearest high-voltage substation in OpenStreetMap is Miranda 220kv (220 kV), about 900 m away.

How clean is the power for MERLIN Edged BIL03 - Bilbao-Arasur?

The grid in Spain emits about 154 g CO₂ per kWh (2025). Largest sources: solar 21.9%, gas 21.5%, wind 20.4%.

Who operates MERLIN Edged BIL03 - Bilbao-Arasur?

MERLIN Edged.

Data centers near Rivabellosa

More MERLIN Edged data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.