MERLIN Edged MAD01 - Madrid-Getafe
MERLIN Edged MAD01 - Madrid-Getafe is an operational data center operated by MERLIN Edged in Getafe, Spain. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | MERLIN Edged |
| Networks | 1 networks PeeringDB. |
| Address | Fundidores 40 |
| Coordinates | 40.31081, -3.69292 |
| Website | edged.es/madrid-getafe |
Power and grid
| Nearest high-voltage substation | Subestación Getafe, 220 kV, 800 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 14 |
| Power plants within 50 km | 917 MW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 154 g CO₂ per kWh (Spain, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 21.9%, gas 21.5%, wind 20.4%, nuclear 18.8%, hydro 11.4%. Clean power: 74.6% |
| Industrial power price | EUR 0.105 per kWh (Spain, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 13.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.9 °C (2001 to 2025) |
| Cooling degree days | 623 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.7 kWh per m² per day |
| Wind at 50 m | 5.1 m/s average |
| Water stress today | High (40-80%) (Spain) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is MERLIN Edged MAD01 - Madrid-Getafe to the power grid?
The nearest high-voltage substation in OpenStreetMap is Subestación Getafe (220 kV), about 800 m away.
How clean is the power for MERLIN Edged MAD01 - Madrid-Getafe?
The grid in Spain emits about 154 g CO₂ per kWh (2025). Largest sources: solar 21.9%, gas 21.5%, wind 20.4%.
Who operates MERLIN Edged MAD01 - Madrid-Getafe?
MERLIN Edged.
Data centers near Getafe
- Espacio Rack 12.9 km
- Secretaría General Adjunta de Informática 14.3 km
- N1 14.6 km · 5.8 MW
- Digital Realty Madrid MAD3 14.9 km · 4 MW
- Digital Realty Madrid MAD4 15.2 km · 9.7 MW
- Templus DC Madrid MAD03 15.4 km
- IaaS Datacenter Madrid 15.5 km
- Digital Realty Madrid MAD1-2 15.5 km · 4.3 MW
More MERLIN Edged data centers
Sources
Correct this page or get the data