Data center in Woodlawn is an operational data center in Woodlawn, United States. Our footprint estimate of its power is about 3.3 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 3.3 MW (range 1.7 MW to 5.4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,787 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 38.73520, -77.15289 |
Power and grid
| Nearest high-voltage substation | Belvoir Substation, 230 kV, 1.7 km away (Virginia Power) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 9 |
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Cove Point Pipeline, interstate pipeline, 9.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 5.8 GW in 56 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 13.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40 °C (2001 to 2025) |
| Cooling degree days | 829 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.24 kWh per m² per day |
| Wind at 50 m | 4.8 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Woodlawn use?
We estimate the facility power at about 3.3 MW. Estimate from building footprint, low confidence.
How close is Data center in Woodlawn to the power grid?
The nearest high-voltage substation in OpenStreetMap is Belvoir Substation (230 kV), about 1.7 km away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.
How clean is the power for Data center in Woodlawn?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Data centers near Woodlawn
- Amazon DCA-64 3.0 km · 15 MW
- Data center in Newington 4.1 km · 12 MW
- Equinix DC7 - Ashburn, Vienna 20.1 km
- Element Critical Northern Virginia VA1 20.2 km · 9.5 MW
- Gosnell - International Gateway 1 (8100 Boone) 20.8 km · 13 MW
- Zayo Washington DC - 2100 M Street NW 21.0 km
- Level(3) McLean 21.2 km · 9.7 MW
- DataBank McLean (IAD2) 21.2 km · 5.5 MW
Sources
Correct this page or get the data