Data center in Woodlawn is an operational data center in Woodlawn, United States. Our footprint estimate of its power is about 3.3 MW.

Key facts

StatusOperational
Facility power3.3 MW (range 1.7 MW to 5.4 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,787 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,400 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates38.73520, -77.15289

Power and grid

Nearest high-voltage substationBelvoir Substation, 230 kV, 1.7 km away (Virginia Power)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km9
UtilityVirginia Electric & Power Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineCove Point Pipeline, interstate pipeline, 9.6 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km5.8 GW in 56 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity357 g CO₂ per kWh (Virginia, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39%
Industrial power priceUSD 0.100 per kWh (Virginia, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature13.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40 °C (2001 to 2025)
Cooling degree days829 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.24 kWh per m² per day
Wind at 50 m4.8 m/s average
Water stress todayMedium - High (20-40%) (Virginia)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Woodlawn use?

We estimate the facility power at about 3.3 MW. Estimate from building footprint, low confidence.

How close is Data center in Woodlawn to the power grid?

The nearest high-voltage substation in OpenStreetMap is Belvoir Substation (230 kV), about 1.7 km away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.

How clean is the power for Data center in Woodlawn?

The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.