Digital Realty AMS3/5/7/8/10 - Amsterdam
Digital Realty AMS3/5/7/8/10 - Amsterdam is an operational data center operated by Digital Realty in Amsterdam, Netherlands. Our footprint estimate of its power is about 13 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Digital Realty |
| Facility power | 13 MW (range 6.4 MW to 21 MW) Estimate from building footprint, low confidence. Footprint estimate: about 10,719 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 5,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 121 networks, 4 internet exchanges PeeringDB. |
| Also known as | Digital Realty AMS3 |
| Address | Cessnalaan 1 |
| Opened | 1992 |
| Coordinates | 52.28415, 4.77086 |
| Website | digitalrealty.com |
Power and grid
| Nearest high-voltage substation | 150 kV Koolhovenlaan, 150 kV, 200 m away (EdgeConnex) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 380 kV, 9 km away |
| HV substations within 10 km | 8 |
| Power plants within 50 km | 4.7 GW in 59 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 254 g CO₂ per kWh (Netherlands, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 34.9%, wind 25%, solar 21.1%, coal 7.1%, bioenergy 5.1%. Clean power: 54.2% |
| Industrial power price | EUR 0.139 per kWh (Netherlands, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 32.1 °C (2001 to 2025) |
| Cooling degree days | 53 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.97 kWh per m² per day |
| Wind at 50 m | 7.5 m/s average |
| Water stress today | Low - Medium (10-20%) (Netherlands) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Digital Realty AMS3/5/7/8/10 - Amsterdam use?
We estimate the facility power at about 13 MW. Estimate from building footprint, low confidence.
How close is Digital Realty AMS3/5/7/8/10 - Amsterdam to the power grid?
The nearest high-voltage substation in OpenStreetMap is 150 kV Koolhovenlaan (150 kV), about 200 m away.
How clean is the power for Digital Realty AMS3/5/7/8/10 - Amsterdam?
The grid in Netherlands emits about 254 g CO₂ per kWh (2025). Largest sources: gas 34.9%, wind 25%, solar 21.1%.
Who operates Digital Realty AMS3/5/7/8/10 - Amsterdam?
Digital Realty.
Data centers near Amsterdam
- EdgeConneX data center in Oosteinde 192 m · 52 MW
- EdgeConneX data center in Oosteinde 250 m · 14 MW
- maincubes AMS01 257 m · 8.1 MW
- EdgeConneX Amsterdam (EDCAMS01) 271 m
- EdgeConneX data center in Oosteinde 328 m · 6.9 MW
- EdgeConneX data center in Oosteinde 408 m · 21 MW
- Digital Realty AMS11 - Amsterdam 424 m · 18 MW
- Digital Realty data center in Oosteinde 509 m · 22 MW
More Digital Realty data centers
- Digital Realty CH1 - Chicago United States
- Digital Realty IAD39 United States
- Digital Realty IAD51 United States
- Digital Realty IAD44 United States
- Digital Realty IAD41 United States
- Digital Realty Singapore SIN11 Singapore
- Digital Realty Toronto YYZ11 Canada
- Digital Realty IAD43 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.