EDGE2 (EG2) - Digital Edge JKT2 - Jakarta is an operational data center operated by Digital Edge Indonesia in Jakarta Selatan, Indonesia. Our footprint estimate of its power is about 30 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Digital Edge Indonesia |
| Facility power | 30 MW (range 15 MW to 48 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,130 m² building outline x 6 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 13,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 42 networks, 3 internet exchanges PeeringDB. |
| Also known as | EDGE2 |
| Address | Jl. Kuningan Mulia |
| Opened | 2024 |
| Coordinates | -6.21387, 106.83522 |
| Website | id.digitaledgedc.com/data-centers/edge2 |
Power and grid
| Nearest high-voltage substation | GIS Dukuh Atas, 150 kV, 800 m away (Perusahaan Listrik Negara) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Gardu Induk Duri Kosambi, 500 kV, 13 km away |
| HV substations within 10 km | 34 |
| Power plants within 50 km | 10 GW in 15 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 705 g CO₂ per kWh (Indonesia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 69.4%, gas 11.6%, hydro 6.7%, bioenergy 5.3%, other renewables 3.4%. Clean power: 15.8% |
Climate and water
| Average temperature | 27.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.2 °C (2001 to 2025) |
| Cooling degree days | 3,369 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.04 kWh per m² per day |
| Wind at 50 m | 3.9 m/s average |
| Water stress today | Medium - High (20-40%) (Indonesia) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does EDGE2 (EG2) - Digital Edge JKT2 - Jakarta use?
We estimate the facility power at about 30 MW. Estimate from building footprint, low confidence.
How close is EDGE2 (EG2) - Digital Edge JKT2 - Jakarta to the power grid?
The nearest high-voltage substation in OpenStreetMap is GIS Dukuh Atas (150 kV), about 800 m away.
How clean is the power for EDGE2 (EG2) - Digital Edge JKT2 - Jakarta?
The grid in Indonesia emits about 705 g CO₂ per kWh (2025). Largest sources: coal 69.4%, gas 11.6%, hydro 6.7%.
Who operates EDGE2 (EG2) - Digital Edge JKT2 - Jakarta?
Digital Edge Indonesia.
Data centers near Jakarta Selatan
- Yellowstone Data Center 250 m · 44 MW
- Matrix Data Center JK3 (MDC JK3) 531 m
- NEX Datacenter (NEX-JK1) Jakarta 1.4 km
- DCI Indonesia (E1) 1.5 km
- Biznet MegaPOP Jakarta MidPlaza 1.7 km
- NTT Indonesia Jakarta 2 2.0 km
- NTT Jakarta 1 Data Center (JKT1) 2.1 km
- BDx CGK1 - Jakarta City Center 2.1 km
More Digital Edge Indonesia data centers
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.