NEX Datacenter (NEX-JK1) Jakarta
NEX Datacenter (NEX-JK1) Jakarta is an operational data center operated by PT. CBN Nusantara (NEX Datacenter) in Jakarta Selatan, Indonesia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | PT. CBN Nusantara (NEX Datacenter) |
| Networks | 18 networks, 1 internet exchanges PeeringDB. |
| Address | Cyber2 Tower, 2nd Floor |
| Coordinates | -6.22642, 106.83244 |
| Website | nexdatacenter.com |
Power and grid
| Nearest high-voltage substation | GIS Setiabudi, 150 kV, 900 m away (Perusahaan Listrik Negara) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | GISTET Kembangan, 500 kV, 13.2 km away |
| HV substations within 10 km | 31 |
| Power plants within 50 km | 10 GW in 15 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 705 g CO₂ per kWh (Indonesia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 69.4%, gas 11.6%, hydro 6.7%, bioenergy 5.3%, other renewables 3.4%. Clean power: 15.8% |
Climate and water
| Average temperature | 27.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.2 °C (2001 to 2025) |
| Cooling degree days | 3,369 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.04 kWh per m² per day |
| Wind at 50 m | 3.9 m/s average |
| Water stress today | Medium - High (20-40%) (Indonesia) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is NEX Datacenter (NEX-JK1) Jakarta to the power grid?
The nearest high-voltage substation in OpenStreetMap is GIS Setiabudi (150 kV), about 900 m away.
How clean is the power for NEX Datacenter (NEX-JK1) Jakarta?
The grid in Indonesia emits about 705 g CO₂ per kWh (2025). Largest sources: coal 69.4%, gas 11.6%, hydro 6.7%.
Who operates NEX Datacenter (NEX-JK1) Jakarta?
PT. CBN Nusantara (NEX Datacenter).
Data centers near Jakarta Selatan
- DCI Indonesia (E1) 178 m
- PSN Networks 779 m
- Matrix Data Center JK3 (MDC JK3) 1.1 km
- Bitera Data Center Indonesia Jakarta 1.1 km · 35 MW
- Yellowstone Data Center 1.3 km · 44 MW
- Equinix JK1 - Jakarta 1.4 km
- EDGE2 (EG2) - Digital Edge JKT2 - Jakarta 1.4 km · 30 MW
- Herza DC - Tifa 1.5 km
More PT. CBN Nusantara (NEX Datacenter) data centers
- NEX Datacenter (NEX-JK2) Jakarta Indonesia
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.