Equinix JK1 - Jakarta
Equinix JK1 - Jakarta is an operational data center operated by Equinix in Jakarta, Indonesia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Networks | 64 networks, 3 internet exchanges PeeringDB. |
| Also known as | OMNIDC JAKARTA |
| Address | Jl. Kuningan Barat Raya No.9, RT.3/RW.2 |
| Coordinates | -6.23490, 106.82279 |
| Website | equinix.com/data-centers/asia-pacific-colocation/indonesia-colocation/jakarta-data-center/jk1 |
Power and grid
| Nearest high-voltage substation | Gardu Induk Mampang Baru, 150 kV, 100 m away (Perusahaan Listrik Negara) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | GISTET Kembangan, 500 kV, 12.5 km away |
| HV substations within 10 km | 31 |
| Power plants within 50 km | 10 GW in 15 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 705 g CO₂ per kWh (Indonesia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 69.4%, gas 11.6%, hydro 6.7%, bioenergy 5.3%, other renewables 3.4%. Clean power: 15.8% |
Climate and water
| Average temperature | 27.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.2 °C (2001 to 2025) |
| Cooling degree days | 3,369 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.04 kWh per m² per day |
| Wind at 50 m | 3.9 m/s average |
| Water stress today | Medium - High (20-40%) (Indonesia) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Equinix JK1 - Jakarta to the power grid?
The nearest high-voltage substation in OpenStreetMap is Gardu Induk Mampang Baru (150 kV), about 100 m away.
How clean is the power for Equinix JK1 - Jakarta?
The grid in Indonesia emits about 705 g CO₂ per kWh (2025). Largest sources: coal 69.4%, gas 11.6%, hydro 6.7%.
Who operates Equinix JK1 - Jakarta?
Equinix.
Data centers near Jakarta
- Herza DC - Tifa 206 m
- Cybertechtonic Pratama Jakarta 261 m
- Equinix 267 m · 11 MW
- NTT Jakarta 2 Data Center (JKT2) 352 m · 18 MW
- Datacenter APJII-Cyber JAKARTA 397 m
- CNI/ISC DC CBR 436 m
- Argon Data Communication 460 m
- Bitera Data Center Indonesia Jakarta 463 m · 35 MW
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.