EdgeConneX Madison (EDCMAD01)
EdgeConneX Madison (EDCMAD01) is an operational data center operated by EdgeConneX in Madison, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | EdgeConneX |
| Networks | 4 networks PeeringDB. |
| Address | 4916 E Broadway |
| Coordinates | 43.04802, -89.29733 |
| Website | edgeconnex.com |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 138 kV, 1.4 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 345 kV, 22.2 km away |
| HV substations within 10 km | 6 |
| Utility | Madison Gas & Electric Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | MISO |
| Nearest gas pipeline | ANR Pipeline Co, interstate pipeline, 400 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 2.3 GW in 23 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 530 g CO₂ per kWh (Wisconsin, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 35.3%, coal 34.8%, nuclear 15.2%, solar 6.6%, hydro 3.3%. Clean power: 29.8% |
| Industrial power price | USD 0.109 per kWh (Wisconsin, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 8.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.8 °C (2001 to 2025) |
| Cooling degree days | 351 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.85 kWh per m² per day |
| Wind at 50 m | 6.8 m/s average |
| Water stress today | Medium - High (20-40%) (Wisconsin) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is EdgeConneX Madison (EDCMAD01) to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 1.4 km away. The local utility is Madison Gas & Electric Co, in the MISO balancing area.
How clean is the power for EdgeConneX Madison (EDCMAD01)?
The grid in Wisconsin emits about 530 g CO₂ per kWh (2025). Largest sources: gas 35.3%, coal 34.8%, nuclear 15.2%.
Who operates EdgeConneX Madison (EDCMAD01)?
EdgeConneX.
Data centers near Madison
- Network 222 7.8 km
- 612 W Main 8.0 km
- University of Wisconsin-Madison 9.2 km
- Data center in Madison 11.5 km · 0.9 MW
- US Signal WI02 - Madison 11.9 km
- SupraNet Communications Madison 18.7 km
- Meta Beaver Dam Data Center 64.4 km · 274 MW
- Data center in Baraboo 74.1 km
More EdgeConneX data centers
- EdgeConneX PHX02 Data Center United States
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConnex DUB04 Ireland
- EdgeConneX Germany
- EdgeConneX Chicago (EDCCHI02) United States
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConnex - DEN02 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.