EdgeConneX Norfolk (EDCNOR01)
EdgeConneX Norfolk (EDCNOR01) is an operational data center operated by EdgeConneX in Norfolk, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | EdgeConneX |
| Networks | 7 networks, 1 internet exchanges PeeringDB. |
| Address | 3800 Village Ave |
| Coordinates | 36.86186, -76.23534 |
| Website | edgeconnex.com |
Power and grid
| Nearest high-voltage substation | Industrial Park Substation, 115 kV, 1.2 km away (Virginia Electric & Power Company) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Reeves Avenue Substation, 230 kV, 4 km away |
| HV substations within 10 km | 20 |
| Utility | Virginia Electric & Power Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Virginia Natural Gas Co, intrastate pipeline, 1.5 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 981 MW in 18 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 357 g CO₂ per kWh (Virginia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 56.7%, nuclear 26.4%, solar 9.5%, coal 3.4%, bioenergy 3.3%. Clean power: 39% |
| Industrial power price | USD 0.100 per kWh (Virginia, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 15.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38 °C (2001 to 2025) |
| Cooling degree days | 929 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.31 kWh per m² per day |
| Wind at 50 m | 6.5 m/s average |
| Water stress today | Medium - High (20-40%) (Virginia) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is EdgeConneX Norfolk (EDCNOR01) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Industrial Park Substation (115 kV), about 1.2 km away. The local utility is Virginia Electric & Power Co, in the PJM balancing area.
How clean is the power for EdgeConneX Norfolk (EDCNOR01)?
The grid in Virginia emits about 357 g CO₂ per kWh (2025). Largest sources: gas 56.7%, nuclear 26.4%, solar 9.5%.
Who operates EdgeConneX Norfolk (EDCNOR01)?
EdgeConneX.
Data centers near Norfolk
- Lumen Norfolk 2.3 km
- Globalinx Virginia Beach CLS 22.0 km
More EdgeConneX data centers
- EdgeConneX PHX02 Data Center United States
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConnex DUB04 Ireland
- EdgeConneX Germany
- EdgeConneX Chicago (EDCCHI02) United States
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConneX data center in Oosteinde Netherlands
- EdgeConnex - DEN02 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.