Enterprise Data Corporation (EDC1 - Sydney)
Enterprise Data Corporation (EDC1 - Sydney) is an operational data center operated by Enterprise Data Corporation (EDC) in Baulkham Hills, Australia. Our footprint estimate of its power is about 1.4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Enterprise Data Corporation (EDC) |
| Facility power | 1.4 MW (range 0.7 MW to 2.2 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,133 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 2 networks PeeringDB. |
| Also known as | Vocus Sydney SYD02 |
| Address | 10-12 Brookhollow Ave |
| Coordinates | -33.73394, 150.96945 |
| Website | enterprisedata.com.au |
Power and grid
| Nearest high-voltage substation | West Castle Hill Zone Substation, 132 kV, 1 km away (Endeavour Energy) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Sydney North Bulk Supply Substation, 330 kV, 10.4 km away |
| HV substations within 10 km | 14 |
| Power plants within 50 km | 229 MW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 18 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 43 °C (2001 to 2025) |
| Cooling degree days | 715 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.65 kWh per m² per day |
| Wind at 50 m | 3.8 m/s average |
| Water stress today | High (40-80%) (New South Wales) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Enterprise Data Corporation (EDC1 - Sydney) use?
We estimate the facility power at about 1.4 MW. Estimate from building footprint, low confidence.
How close is Enterprise Data Corporation (EDC1 - Sydney) to the power grid?
The nearest high-voltage substation in OpenStreetMap is West Castle Hill Zone Substation (132 kV), about 1 km away.
How clean is the power for Enterprise Data Corporation (EDC1 - Sydney)?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates Enterprise Data Corporation (EDC1 - Sydney)?
Enterprise Data Corporation (EDC).
Data centers near Baulkham Hills
- Fujitsu Western Sydney Data Centre 10.6 km · 12 MW
- AirTrunk SYD1 10.9 km · 25 MW
- Sydney 01 11.0 km · 9.8 MW
- AirTrunk SYD1 Sydney West 11.0 km · 6.3 MW
- AirTrunk SYD3 Sydney West 11.3 km · 11 MW
- AWS Asia Pacific (Sydney) Region Data Centre 11.4 km · 14 MW
- Equinix SY9x 11.6 km · 11 MW
- TPG Telecom data center in Newington 13.7 km · 6.4 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.