Fujitsu Western Sydney Data Centre
Fujitsu Western Sydney Data Centre is an operational data center operated by Fujitsu in Greystanes, Australia. Our footprint estimate of its power is about 12 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Fujitsu |
| Facility power | 12 MW (range 6.2 MW to 20 MW) Estimate from building footprint, low confidence. Footprint estimate: about 10,358 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 5,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Bellevue Circuit 6, 2145 |
| Coordinates | -33.82185, 150.92378 |
| Website | fujitsu.com/au/services/data-centres |
Power and grid
| Nearest high-voltage substation | Holroyd Transmission Substation, 330 kV, 1.5 km away (TransGrid) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 19 |
| Power plants within 50 km | 229 MW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 518 g CO₂ per kWh (Australia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 42.9%, solar 20.4%, gas 15.5%, wind 13.8%, hydro 4.4%. Clean power: 39.8% |
Climate and water
| Average temperature | 18.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.9 °C (2001 to 2025) |
| Cooling degree days | 673 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.65 kWh per m² per day |
| Wind at 50 m | 5.2 m/s average |
| Water stress today | High (40-80%) (New South Wales) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Fujitsu Western Sydney Data Centre use?
We estimate the facility power at about 12 MW. Estimate from building footprint, low confidence.
How close is Fujitsu Western Sydney Data Centre to the power grid?
The nearest high-voltage substation in OpenStreetMap is Holroyd Transmission Substation (330 kV), about 1.5 km away.
How clean is the power for Fujitsu Western Sydney Data Centre?
The grid in Australia emits about 518 g CO₂ per kWh (2025). Largest sources: coal 42.9%, solar 20.4%, gas 15.5%.
Who operates Fujitsu Western Sydney Data Centre?
Fujitsu.
Data centers near Greystanes
- Sydney 01 3.9 km · 9.8 MW
- AirTrunk SYD1 4.6 km · 25 MW
- AirTrunk SYD1 Sydney West 4.6 km · 6.3 MW
- AirTrunk SYD3 Sydney West 5.1 km · 11 MW
- AWS Asia Pacific (Sydney) Region Data Centre 5.9 km · 14 MW
- CDC Sydney EC1 7.9 km · 17 MW
- AWS Asia Pacific (Sydney) Region Data Centre 7.9 km · 10 MW
- Data center in Minchinbury 8.0 km · 12 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.