Equinix AM8 - Amsterdam, Gyroscoopweg
Equinix AM8 - Amsterdam, Gyroscoopweg is an operational data center operated by Equinix in Amsterdam, Netherlands. Our footprint estimate of its power is about 1 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Facility power | 1 MW (range 0.4 MW to 2.6 MW) Estimate from building footprint, low confidence. Footprint estimate: about 8,649 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 430 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 28 networks, 7 internet exchanges PeeringDB. |
| Also known as | Equinix Amsterdam AM8 |
| Address | Gyroscoopweg 2E & 2F |
| Opened | 2002 |
| Coordinates | 52.39681, 4.83858 |
| Website | equinix.com/locations/netherlands-colocation/amsterdam-data-centers/am8 |
Power and grid
| Nearest high-voltage substation | 150 kV Hemweg, 150 kV, 900 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | 380 kV Oostzaan, 380 kV, 4.4 km away |
| HV substations within 10 km | 12 |
| Power plants within 50 km | 4.5 GW in 61 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 254 g CO₂ per kWh (Netherlands, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 34.9%, wind 25%, solar 21.1%, coal 7.1%, bioenergy 5.1%. Clean power: 54.2% |
| Industrial power price | EUR 0.139 per kWh (Netherlands, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 32.1 °C (2001 to 2025) |
| Cooling degree days | 53 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.97 kWh per m² per day |
| Wind at 50 m | 7.5 m/s average |
| Water stress today | Low - Medium (10-20%) (Netherlands) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Equinix AM8 - Amsterdam, Gyroscoopweg use?
We estimate the facility power at about 1 MW. Estimate from building footprint, low confidence.
How close is Equinix AM8 - Amsterdam, Gyroscoopweg to the power grid?
The nearest high-voltage substation in OpenStreetMap is 150 kV Hemweg (150 kV), about 900 m away.
How clean is the power for Equinix AM8 - Amsterdam, Gyroscoopweg?
The grid in Netherlands emits about 254 g CO₂ per kWh (2025). Largest sources: gas 34.9%, wind 25%, solar 21.1%.
Who operates Equinix AM8 - Amsterdam, Gyroscoopweg?
Equinix.
Data centers near Amsterdam
- WideXS - G54 423 m
- nLighten Amsterdam AMS1 504 m
- NorthC Amsterdam 1 838 m
- Databarn Amsterdam 853 m · 0.8 MW
- Qupra DC 1.7 km
- Serverfarm AMS1 Amsterdam 2.2 km
- Zayo Amsterdam 4.4 km
- Global Switch Amsterdam 5.9 km · 32 MW
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.