Equinix CL3 - Calgary (formerly Q9 Calgary Three)

Equinix CL3 - Calgary (formerly Q9 Calgary Three) is an operational data center operated by Equinix in Calgary, Canada. Our footprint estimate of its power is about 22 MW.

Key facts

StatusOperational
OperatorEquinix
Facility power22 MW (range 11 MW to 36 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 18,508 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 9,400 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks15 networks, 1 internet exchanges
PeeringDB.
Also known asEquinix CL3 Calgary
Address5300 86 Ave SE
Coordinates50.97697, -113.95668
Websiteequinix.com/data-centers/americas-colocation

Power and grid

Nearest high-voltage substationSubstation 24, 138 kV, 2 km away (ENMAX)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationSubstation No. 25, 240 kV, 4.9 km away
HV substations within 10 km17
UtilityEnmax Power Corporation (municipal)
Electric retail service territory (HIFLD, US government).
Power plants within 50 km1.7 GW in 11 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity192 g CO₂ per kWh (Canada, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5%

Climate and water

Average temperature4.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37 °C (2001 to 2025)
Cooling degree days65 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.67 kWh per m² per day
Wind at 50 m5.8 m/s average
Water stress todayMedium - High (20-40%) (Alberta)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Equinix CL3 - Calgary (formerly Q9 Calgary Three) use?

We estimate the facility power at about 22 MW. Estimate from building footprint, low confidence.

How close is Equinix CL3 - Calgary (formerly Q9 Calgary Three) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Substation 24 (138 kV), about 2 km away. The local utility is Enmax Power Corporation.

How clean is the power for Equinix CL3 - Calgary (formerly Q9 Calgary Three)?

The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.

Who operates Equinix CL3 - Calgary (formerly Q9 Calgary Three)?

Equinix.