Data Center Directory

Hertfordshire Data Centre

Hertfordshire Data Centre is an operational data center in Welwyn Garden City, United Kingdom. Our footprint estimate of its power is about 21 MW.

Key facts

StatusOperational
Facility power21 MW (range 10 MW to 33 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 17,409 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 9,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressMundells, AL7 1GE, Welwyn Garden City
Coordinates51.80790, -0.18643
Websitecapitaland-ascendasreit.com/en/our-portfolio/united-kingdom---europe/data-centres.html

Power and grid

Nearest high-voltage substationBlack Fan Substation, 132 kV, 1 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationWymondley Substation, 400 kV, 14 km away
HV substations within 10 km3
Power plants within 50 km4.2 GW in 125 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity218 g CO₂ per kWh (United Kingdom, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2%

Climate and water

Average temperature10.2 °C
NASA POWER, average of 2001 to 2025.
Highest temperature33.8 °C (2001 to 2025)
Cooling degree days39 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.9 kWh per m² per day
Wind at 50 m7.1 m/s average
Water stress todayLow - Medium (10-20%) (England)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Hertfordshire Data Centre use?

We estimate the facility power at about 21 MW. Estimate from building footprint, low confidence.

How close is Hertfordshire Data Centre to the power grid?

The nearest high-voltage substation in OpenStreetMap is Black Fan Substation (132 kV), about 1 km away.

How clean is the power for Hertfordshire Data Centre?

The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.

Data centers near Welwyn Garden City

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.