Hertfordshire Data Centre
Hertfordshire Data Centre is an operational data center in Welwyn Garden City, United Kingdom. Our footprint estimate of its power is about 21 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 21 MW (range 10 MW to 33 MW) Estimate from building footprint, low confidence. Footprint estimate: about 17,409 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 9,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Mundells, AL7 1GE, Welwyn Garden City |
| Coordinates | 51.80790, -0.18643 |
| Website | capitaland-ascendasreit.com/en/our-portfolio/united-kingdom---europe/data-centres.html |
Power and grid
| Nearest high-voltage substation | Black Fan Substation, 132 kV, 1 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Wymondley Substation, 400 kV, 14 km away |
| HV substations within 10 km | 3 |
| Power plants within 50 km | 4.2 GW in 125 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.8 °C (2001 to 2025) |
| Cooling degree days | 39 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.9 kWh per m² per day |
| Wind at 50 m | 7.1 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Hertfordshire Data Centre use?
We estimate the facility power at about 21 MW. Estimate from building footprint, low confidence.
How close is Hertfordshire Data Centre to the power grid?
The nearest high-voltage substation in OpenStreetMap is Black Fan Substation (132 kV), about 1 km away.
How clean is the power for Hertfordshire Data Centre?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Data centers near Welwyn Garden City
- COLT DC London 908 m · 35 MW
- ServerChoice SC-2 1.7 km
- ServerChoice SC-1 9.0 km
- Nigsun Data Centre NCS1 10.0 km
- BT Computer Centre 10.1 km · 4 MW
- nLighten London STN1 13.7 km
- Google Datacentre Waltham Cross 15.6 km · 13 MW
- Google Waltham Cross 15.8 km · 124 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.