Google Waltham Cross

Google Waltham Cross is an operational AI data center operated by Google in Cheshunt, United Kingdom. Its power is about 124 MW. Epoch AI estimates about 124,000 H100-equivalent AI chips (TPU v6e).

Key facts

StatusOperational
OperatorGoogle
UsersGoogle DeepMind (speculative)
Facility power124 MW
Reported (Epoch AI or owner data)
IT power88 MW
AI compute124,000 H100-equivalents
AI chipsTPU v6e
Reported (Epoch AI or owner data)
GPU capacity if all AIabout 49,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 3.3 billion
Epoch AI estimate, 2025 USD.
Energy partnersShell Energy Europe, Engie
AddressLand at Maxwell's Farm West, Great Cambridge Road, Cheshunt, EN8 8XH
Coordinates51.70205, -0.03359 (city level)

Power and grid

Nearest high-voltage substationUnnamed substation, 132 kV, 1.5 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationWaltham Cross Substation, 400 kV, 2 km away
HV substations within 10 km18
Power plants within 50 km3.4 GW in 110 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity218 g CO₂ per kWh (United Kingdom, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2%

Climate and water

Average temperature10.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature34 °C (2001 to 2025)
Cooling degree days46 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.97 kWh per m² per day
Wind at 50 m7.2 m/s average
Water stress todayLow - Medium (10-20%) (England)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Build timeline

DatePowerH100eWhat the satellite images and filings show
2024-01-0100Land clearing begins (Sentinel-2 imagery).
2025-09-01124 MW124,000Building complete and operational; full buildout reached. Sentinel-2 imagery shows the building finished with components installed and cars in the car park. Confirmed by Google's official blog post announcing the Waltham Cross data centre opening (https://blog.google/company-news/inside-google/around-the-globe/google-europe/united-kingdom/waltham-cross-data-centre/).
2026-04-23124 MW124,000Full buildout reconfirmed via high-resolution Pléiades-Neo satellite image; no capacity change since September 2025.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2025-09-01TPU v6e133,385Estimate

Satellite view

Questions

How much power does Google Waltham Cross use?

Public data puts the facility power at about 124 MW. Reported (Epoch AI or owner data).

What chips does Google Waltham Cross use?

Reported chips: TPU v6e.

How close is Google Waltham Cross to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (132 kV), about 1.5 km away.

How clean is the power for Google Waltham Cross?

The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.

Who operates Google Waltham Cross?

Google. Reported users: Google DeepMind.

Data centers near Cheshunt