nLighten London STN1
nLighten London STN1 is an operational data center operated by nLighten HQ in Hoddesdon, United Kingdom. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | nLighten HQ |
| Networks | 9 networks PeeringDB. |
| Address | Geddings Road 7 |
| Coordinates | 51.75977, -0.00296 |
| Website | nlighten.com/en/united-kingdom-data-centers/london |
Power and grid
| Nearest high-voltage substation | Rye House Substation, 132 kV, 500 m away (UK Power Networks) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Rye House Transformer Station, 400 kV, 800 m away |
| HV substations within 10 km | 13 |
| Power plants within 50 km | 3.4 GW in 110 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.8 °C (2001 to 2025) |
| Cooling degree days | 39 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.9 kWh per m² per day |
| Wind at 50 m | 7.1 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is nLighten London STN1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Rye House Substation (132 kV), about 500 m away.
How clean is the power for nLighten London STN1?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates nLighten London STN1?
nLighten HQ.
Data centers near Hoddesdon
- Google Waltham Cross 6.8 km · 124 MW
- Google Datacentre Waltham Cross 7.7 km · 13 MW
- Kao Data KLON-01 9.2 km · 4.1 MW
- Virtus LONDON1 12.5 km · 3.7 MW
- COLT DC London 13.2 km · 35 MW
- Hertfordshire Data Centre 13.7 km · 21 MW
- ServerChoice SC-2 14.4 km
- Soverign Data Centre - Metro Point 15.8 km · 1.5 MW
More nLighten HQ data centers
- nLighten Swindon BRS2 United Kingdom
- nLighten Leeds LBA1 United Kingdom
- nLighten Strasbourg SXB1 France
- nLighten Besancon MLH1 France
- nLighten Liverpool LPL1 United Kingdom
- nLighten Paris PAR2 France
- nLighten Sophia Antipolis NCE1 France
- nLighten Paris PAR1 France
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.