Google Datacentre Waltham Cross
Google Datacentre Waltham Cross is an operational data center operated by Google in Cheshunt, United Kingdom. Our footprint estimate of its power is about 13 MW. Likely chips: Google TPU (plus NVIDIA GPUs for cloud customers) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | |
| Facility power | 13 MW (range 5.4 MW to 34 MW) Estimate from building footprint, low confidence. Footprint estimate: about 111,942 m² site outline x 0.12 kW per m² of land. |
| AI chips | Google TPU (plus NVIDIA GPUs for cloud customers) Guess from the operator, not confirmed. Google runs most of its AI work on its own TPU chips. |
| GPU capacity if all AI | about 5,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 51.69619, -0.04886 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 132 kV, 300 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 275 kV, 3.3 km away |
| HV substations within 10 km | 17 |
| Power plants within 50 km | 3.5 GW in 112 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34 °C (2001 to 2025) |
| Cooling degree days | 46 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.97 kWh per m² per day |
| Wind at 50 m | 7.2 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Google Datacentre Waltham Cross use?
We estimate the facility power at about 13 MW. Estimate from building footprint, low confidence.
What chips does Google Datacentre Waltham Cross use?
No chips are reported. Based on the operator, the likely chips are Google TPU (plus NVIDIA GPUs for cloud customers).
How close is Google Datacentre Waltham Cross to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (132 kV), about 300 m away.
How clean is the power for Google Datacentre Waltham Cross?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates Google Datacentre Waltham Cross?
Google.
Data centers near Cheshunt
- Google Waltham Cross 1.2 km · 124 MW
- Virtus LONDON1 4.9 km · 3.7 MW
- nLighten London STN1 7.7 km
- Ark Data Centres Meridian Park 8.5 km · 11 MW
- Soverign Data Centre - Metro Point 8.6 km · 1.5 MW
- Kao Data KLON-01 14.7 km · 4.1 MW
- COLT DC London 14.8 km · 35 MW
- ServerChoice SC-2 15.5 km
More Google data centers
- Goodnight United States
- Google Fort Wayne United States
- Google Omaha United States
- Google Columbus United States
- Google Pryor (North) United States
- Google New Albany United States
- Google Storey County United States
- Google Lincoln United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.