ServerChoice SC-2 is an operational data center operated by ServerChoice in Welwyn Garden City, United Kingdom. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | ServerChoice |
| Networks | 1 networks PeeringDB. |
| Address | BioPark, Broadwater Road, |
| Coordinates | 51.79756, -0.20381 |
| Website | serverchoice.com |
Power and grid
| Nearest high-voltage substation | Welwyn Substation, 132 kV, 1.1 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Wymondley Substation, 400 kV, 14.8 km away |
| HV substations within 10 km | 6 |
| Power plants within 50 km | 4.1 GW in 122 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.8 °C (2001 to 2025) |
| Cooling degree days | 39 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.9 kWh per m² per day |
| Wind at 50 m | 7.1 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is ServerChoice SC-2 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Welwyn Substation (132 kV), about 1.1 km away.
How clean is the power for ServerChoice SC-2?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates ServerChoice SC-2?
ServerChoice.
Data centers near Welwyn Garden City
- COLT DC London 1.4 km · 35 MW
- Hertfordshire Data Centre 1.7 km · 21 MW
- BT Computer Centre 8.6 km · 4 MW
- ServerChoice SC-1 10.1 km
- Nigsun Data Centre NCS1 11.0 km
- nLighten London STN1 14.4 km
- Google Datacentre Waltham Cross 15.5 km · 13 MW
- Google Waltham Cross 15.8 km · 124 MW
More ServerChoice data centers
- ServerChoice SC-1 United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.