Interxion CPH02
Interxion CPH02 is an operational data center in Ballerup, Denmark. Our footprint estimate of its power is about 16 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 16 MW (range 7.9 MW to 25 MW) Estimate from building footprint, low confidence. Footprint estimate: about 13,247 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 6,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 55.72654, 12.37630 |
Power and grid
| Grid carbon intensity | 120 g CO₂ per kWh (Denmark, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | wind 56.9%, bioenergy 21.4%, solar 12.8%, oil and other fossil 4.9%, coal 2.5%. Clean power: 91.2% |
| Industrial power price | EUR 0.118 per kWh (Denmark, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 30 °C (2001 to 2025) |
| Cooling degree days | 44 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.91 kWh per m² per day |
| Wind at 50 m | 7.6 m/s average |
| Water stress today | Low (<10%) (Denmark) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Interxion CPH02 use?
We estimate the facility power at about 16 MW. Estimate from building footprint, low confidence.
How clean is the power for Interxion CPH02?
The grid in Denmark emits about 120 g CO₂ per kWh (2025). Largest sources: wind 56.9%, bioenergy 21.4%, solar 12.8%.
Data centers near Ballerup
- Digital Realty Copenhagen CPH1-3 188 m · 8.9 MW
- Interxion CPH03 229 m · 5.9 MW
- Cibicom Datacenter Ballerup 437 m
- atNorth DEN01 3.2 km
- Aeven data center in Rødovre 4.5 km · 2 MW
- GlobalConnect Glostrup 4.6 km · 2.5 MW
- Penta Infra Copenhagen CPH01 5.1 km
- Adeo Datacenter 6.6 km · 4.1 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.