Interxion PAR4
Interxion PAR4 is an operational data center operated by Digital Realty in Nanterre, France. Our footprint estimate of its power is about 3 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Digital Realty |
| Facility power | 3 MW (range 1.5 MW to 4.7 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,234 m² building outline x 2 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Rue du Port 21, 92000, Nanterre |
| Coordinates | 48.89395, 2.17506 |
Power and grid
| Nearest high-voltage substation | Poste électrique de Rueil, 225 kV, 600 m away (RTE) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 23 |
| Power plants within 50 km | 2.1 GW in 50 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.2 °C (2001 to 2025) |
| Cooling degree days | 106 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.19 kWh per m² per day |
| Wind at 50 m | 6.4 m/s average |
| Water stress today | Low - Medium (10-20%) (France) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Interxion PAR4 use?
We estimate the facility power at about 3 MW. Estimate from building footprint, low confidence.
How close is Interxion PAR4 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste électrique de Rueil (225 kV), about 600 m away.
How clean is the power for Interxion PAR4?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates Interxion PAR4?
Digital Realty.
Data centers near Nanterre
- Orange data center in Rueil-Malmaison 1.5 km
- Bouygues Télécom data center in Nanterre 1.6 km · 1.8 MW
- Data center in Rueil-Malmaison 1.8 km
- IFP data center in Rueil-Malmaison 1.8 km
- Level (3) Le Capitole Nanterre 2.9 km
- Green Data - Nanterre 3.0 km
- Level(3) Paris (Le Capitole) 3.0 km
- dc2scale Nanterre 3.4 km
More Digital Realty data centers
- Digital Realty CH1 - Chicago United States
- Digital Realty IAD39 United States
- Digital Realty IAD51 United States
- Digital Realty IAD44 United States
- Digital Realty IAD41 United States
- Digital Realty Singapore SIN11 Singapore
- Digital Realty Toronto YYZ11 Canada
- Digital Realty IAD43 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.